AREX
TM
30W – 50W
10
1
1 CONTENTS OF THE PACKAGING
1.1 UNPACKING
When unpacking the marking system from the shipping carton you should:
•
Remove the documentation from the top of the marking system
•
Remove the accessories
•
Carefully remove the marking system from the packaging using both hands
WARNING!
Be extremely careful to not damage the connection cable between Scan Head and Rack.
Figure 2: Unpacking.
Before installing or operating the marking system, you should:
•
Inspect the shipping container for damage
•
Inspect the marking system for signs of damage
•
Confirm that the shipping carton contains all items on the shipping inventory list including any
accessories
Retain all packaging materials until the marking system has been inspected for completeness and damage,
and you have checked the operating performance. If anything is missing or defective, see chapter 7 for
contact details.
Содержание Arex 30W
Страница 1: ...USER S MANUAL ArexTM 30W 50W ...
Страница 26: ...AREXTM 30W 50W 26 2 2 4 2 1 ENABLE SIGNAL S SCHEME COMMAND BOX CONNECTOR Figure 15 ENABLE signal s scheme ...
Страница 49: ...USE AND OPERATION 49 4 Edit Filling properties such as filling type interline etc using the Properties browser ...
Страница 92: ...92 APPENDIX G MECHANICAL DRAWINGS ...
Страница 93: ...93 NOTE Please refer to Datalogic website for detailed drawings ...
Страница 96: ......