Datacom Systems 1000BT-AT+7C Скачать руководство пользователя страница 2

2.2  Upon applying power the traffic on the link will be momentarily interrupted as the endpoint devices 

establish link with the Network A and B ports of the powered tap.  Check for green link lights on the 
Network A and B ports. These lights should flash to indicate activity if data is passing on the link. 

2.3  Once valid link has been established the proper functionality of the power fault tolerance feature must 

be tested.  Disconnect the power supplies from Unit A and check for link light on the endpoint devices 
of the link to confirm that they have re-established link with one another through the passive tap.   

2.4  When Unit A is powered up or down a momentary interruption of link always occurs as the relay 

based power fault tolerance system moves to a closed position to provide a passive non-powered 
bypass or moves back out of position to once again allow data to pass through the powered tapping 
circuit. This interruption may be reduced to the shortest possible duration by setting the endpoint 
devices to Port Fast, Fast Learn or an equivalent setting. 

 

3.   

CONNECTING MONITORING TOOLS

 

3.1  Before connecting the tools first verify that the fiber jumper cables between Unit A and Unit B  are    

properly connected and showing link when power has been applied.  Green link lights should appear 
adjacent to the A Out and B Out ports of Unit A as well as the A In and B In ports of Unit B. 

3.2  Using a Cat 5 or higher cable of appropriate length connect the 1-A Monitor port to the appropriate 

monitor / capture card of a monitoring tool or data collection device.  Using a second cable connect 
the 1-B Monitor port to an additional monitor / capture card on the same tool or device. 

3.3  Verify link by checking for a green light adjacent to each tap Monitor port and also on the tool or 

device to which it is connected.  If data is passing on the tapped link these light should blink to 
indicate the presence of activity 

3.4  Additional validation of proper installation should be provided by checking the attached monitoring 

tool or device for the presence of data packets from both the Rx and Tx sides of the tapped link. 

3.5  Additional monitoring tools or devices should be connected to the remaining Monitor ports using the 

same procedures. 

Congratulations - the installation is now complete! 

TROUBLESHOOTING 

SYMPTOM 

POSSIBLE CAUSES AND SOLUTIONS 

Link stops passing data when 
power to A unit is lost 

Passive bypass is directional 

– try reversing position of cables in 

Network A and Network B. 

No link on endpoints of 
tapped link 

Tap assembly is for 1000 Mbps links only 

– verify that endpoint 

devices are both 10/100/1000 capable and set to Auto or fixed. 

Tools on A unit see data but 
tools on B do not see data  

Confirm that B unit has power and confirm that A Out and B Out 
fiber  ports of  A unit are properly connected to the A In and B In 
ports of B unit 

– also check that green link lights are illuminated 

and flashing to indicate passing of data. 

Link is functioning properly 
but no data is visible to any of 
the tools on A unit or B unit 

Check to ensure that at least one functioning power supply is 
connected to each of the two units and that the appropriate 
green power indicators on front panel are illuminated. 

Tools on B unit see only one 
side of conversation 

Verify that the A Out and B Out fiber  ports of A unit are properly 
connected to the A In and B In ports of B unit and confirm that 
green link lights are illuminated. 

 

Отзывы: