RCM (Regulatory Compliance Mark)
The product complics with the requirements of the applicable
Australian standards
DSP-338i-ODS
User manual
DSP-338i-ODS
User manual
Disconnected with the PV components array and electricity grid before any
repair work;
After turn off AC breaker and DC switch for 5 minutes later, the maintenance
or repair of the inverter can be carried out!
Inverter should work again after removing any faults. If you need any repair
work, please contact with the local authorized service center;
Can’t open the internal components of inverter without authorized. DASS
Tech Co., Ltd does not take any responsibility for the losses from that.