32
LARA manual / LARA - SUB
14.- Flying a cluster of 2 or 3 LARA-SUB units after transport
platform is removed
Fig.1
To fly a LARA-SUB array, which is usually
transported in clusters of 2 or 3 units on
their platform, first attach the AX-LARA to
the unit on top, removing the two upper
front pins of the unit.
Fig.2
The result can be seen in the figure.
Fig.3
Attach the rear connecting rod to the back
plates of the unit with a pin.
Fig.4
Shackle the chain hoist to the PICK-UP at
the hole position indicated by Ease Focus.
Fig.1
Fig.3
Fig.4
Fig.2
Содержание LARA
Страница 1: ...1 LARA manual LARA SUB LARA AND LARA SUB RIGGING MANUAL...
Страница 5: ...5 LARA manual LARA SUB 2 Video tutorial Click or scan the code Stack four LARA on top of PL LARA...
Страница 9: ...9 LARA manual LARA SUB 4 Video tutorial Click or scan the code GS LARA installation...
Страница 24: ...24 LARA manual LARA SUB Click or scan the code 10 Video tutorial Flying two LARA SUB...
Страница 31: ...31 LARA manual LARA SUB 13 Video tutorial Click or scan the code LARA and LARA SUB groundstack with JP LARA...
Страница 34: ...34 LARA manual LARA SUB 14 Video tutorial Click or scan the code Flying two LARA SUB...
Страница 39: ......