
SET-UP STEPS AND INFORMATION
45°
SITE SELECTION & INITIAL SET-UP
•
Select a flat, well-drained surface clear of sharp objects.
•
Fold out the tent and lay it out on the ground with the
entrance positioned to your satisfaction.
•
Secure the tent to the ground by using a peg in each
corner as well as a peg at each pole end - refer page 4.
•
Do not hit the peg all the way in at this point. Leave the
hook exposed.
WARNING: DO NOT SET UP YOUR TENT
UNDERNEATH ANY OVERHANGING TREE LIMBS.
INFLATING THE AIR POLES
Inflate the Air Poles in this sequence:
AT-6 Tent Front, Rear, Middle.
AT-4 Tent Front, Rear.
•
To prepare the inflation of the Air Poles, place the
Boston valve onto the pole’s collar and tighten by
screwing clockwise
A
. Ensure it screws in easily as
rotating it forcefully may cause damage to the thread.
•
Unscrew the valve cap by turning anti-clockwise
B
.
•
Firmly insert the end of the pump hose into the valve
C
and commence inflating. When inflated remove pump
hose and seal with valve cap
D
.
Whilst inflating the individual poles, it may be
necessary to make adjustments as the poles
begin to inflate. Lift the pole to help position it
during the final stages of inflation
E
.
Note: Assistance may be required.
Repeat the above for the remaining poles.
THE RIDGE POLES
•
Install Ridge Poles after the Air Poles have been inflated.
•
Inflate the Ridge Poles
A
.
•
Enter the tent and unzip the roof access points
B
and
insert the Ridge Poles, attach them to the Air Poles
using the Velcro tabs located on the Air Pole and
either end of the Ridge Poles.
1
2
3
TIP
E
1
1
2
2
3
AT-6 AIR POLE INFLATION ORDER
AT-6 RIDGE POLES X 2
1
2
3
AT-4 AIR POLE INFLATION ORDER
AT-4 RIDGE POLES X 1
1
2
A
B
D
C
B
A
ROOF
ACCESS
POINT
INSIDE
TENT.
AT-6 ONLY.
THE LONGER
RIDGE POLE
IS PLACED
BETWEEN
THE MIDDLE
AND REAR
AIR POLES
AT-4 AND AT-6 TENT SET-UP & CARE INSTRUCTIONS
To ensure maximum anchoring, insert
the peg in the ground at a 45° angle.
TIP