2.2 Pre-Installation Responsibilities and component packing list
This document is a guide to the steps that need to be performed to correctly install
the SL180 Minor Surgical light. However, the work required to be performed is the
responsibility of the owner or designated contractor/s.
All fixings between DARAY lights and the building super-structure must be approved
by either the chief project engineer or an appropriate and competent structural
assessor.
The components supplied by DARAY for fitting / installation should be the following
items in the specified quantities.
SL180LFM
Qty.
IEC Cable (5m Orange)
1
Mobile Base
1
Light head and upstand assembly
1
Bag of fixings
1
Microfibre cloth
1
User Manual & Assembly Guide
1
2.3 Pre-Start Checks
Please check that the power cable is without visible damage, harsh folds, knots or
cuts in the rubberised coating.
When applicable, please check that the cable is fully inserted into the power socket,
before switching the power on.
Please check that the head and all parts of the base are without visible damage.
Содержание SL180
Страница 1: ...SL180 LED Mobile Minor Surgical Light Operating Installation Manual QAM SL180LFM 0319 10...
Страница 2: ...Page 1 of 19...
Страница 7: ...Page 6 of 19 2 1 Technical Drawing...
Страница 20: ...Page 19 of 19 Service Notes...
Страница 21: ...Page 20 of 19...
Страница 22: ...Page 21 of 19...
Страница 23: ...Page 22 of 19...