
13
Power Measurement
For measuring the output power on
AIS channel 1 or 2
, use the setup below and wait for the
automatic transmission from the AIS transponder.
The test box must receive a trigger signal on RF IN in order to start the power measurement. If
the test box waits for more than 20 seconds, the trigger signal level might be too low. Then
connect a VHF antenna to RF IN (dotted figure):
Alternatively, use this setup:
ANT
AIS TRANSPONDER
SIGNAL
COMBINER
ANT.
AIS TRANSPONDER
Содержание Futronic GMDSS-AIS-SART
Страница 2: ...2 This page is intentionally left blank...
Страница 42: ...42...