DT-50 and DT-50A Tire Changer
10
P/N 5900260 — Rev. A1 — Dec. 2020
Installation Checklist
Following are the steps needed to install the Tire Changer. Perform them in the order shown.
☐
1. Review the installation Safety Rules.
☐
2. Make sure you have the necessary Tools.
☐
3. Find an appropriate Location.
☐
4. Make sure there is adequate Clearance around and above the Tire Changer.
☐
5. Unpack the Unit.
☐
6. Move the Tire Changer to its permanent location.
☐
7. Anchor the Unit.
☐
8. Install the Swing Arm.
☐
9. Install the Assist Tower and Arm. (DT-50A Only)
☐
10. Assist Arm motion adjustment, if required. (DT-50A Only)
☐
11. Connect to Air.
☐
12. Connect to Power.
Switching to 220 VAC operation requires a certified, licensed
Electrician.
☐
13. Prepare the Lube Bucket.
☐
14. Review the Final Checklist.
Содержание DT-50
Страница 57: ...DT 50 and DT 50A Tire Changer 57 P N 5900260 Rev A1 Dec 2020 Wiring Diagram...
Страница 58: ...DT 50 and DT 50A Tire Changer 58 P N 5900260 Rev A1 Dec 2020 Labels...
Страница 59: ...DT 50 and DT 50A Tire Changer 59 P N 5900260 Rev A1 Dec 2020 A B C D Model DT 50A Only Model DT 50 Only...
Страница 60: ...DT 50 and DT 50A Tire Changer 60 P N 5900260 Rev A1 Dec 2020...
Страница 73: ...DT 50 and DT 50A Tire Changer 73 P N 5900260 Rev A1 Dec 2020 Gearbox...
Страница 83: ...DT 50 and DT 50A Tire Changer 83 P N 5900260 Rev A1 Dec 2020 Maintenance Log...
Страница 84: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2020 Dannmar Inc All rights reserved Dannmar com...