
Installation procedure
1. Please read these notes carefully before commencing work. In case of doubt please
consult a qualified electrician. Ensure wires and cables are securely held within the
connection terminals.
IMPORTANT: The CZ HB (xx) Control Unit clock battery must be engaged (ON)
prior to installation by switching the RED dip switch (see diagram E) to the
DOWN position.
2. POSITIONING: The CZ HB (xx) switch should be installed to achieve correct
coverage of the area, see diagram B. If the photocell override facility (enabled via
ControlZAPP app) is required, the switch must be located above an area where
daylight can give greater illumination than the artificial light. Avoid locating this
product where it is exposed to drafty conditions (exposed lobbies, open ceiling
voids or near fans) or near heat sources.
3. Disconnect the PIR from the circuit before performing insulation testing of the wiring
circuit.
4. Do not connect on a circuit with large inductive loads, as induced spikes may cause
false triggering or damage the PIR.
5. CZ HB (xx) must be connected to the ControlZAPP Power Supply (CZPS) via the
ControlZAPP communication cable (telejack) provided, for wiring see diagrams C
and D. NOTE: The use of non ControlZAPP connectors may damage the CZ CESR
or CZPS and will invalidate the warranty).
6. Knockout or drill the appropriate holes on the mounting plate for attaching the plate
to the ceiling or back box (if applicable). Feed telejack through the appropriate (side
or rear) entry hole. Screw the back mounting plate to the ceiling or back box via the
mounting holes. Push the telejack connector into the sensor head terminal. Push the
sensor head onto the mounting plate and align the side clips with the slots on the
sensor heads
Settings and calibration
NOTE: ALL settings are adjusted by ControlZAPP App as specified in the
ControlZAPP App User Guide
(downloadable from the DANLERS website)
including: MODE settings, SCHEDULER settings and photocell settings and
intelligent photocell calibration procedure.
MODE settings include: Detect Movement (enable or disable), Sensitivity, Short Visit
Mode (with timer), Turn ON automatically (Presence detection or Absence detection),
Turn OFF timeout (from10sec to 23hrs 59min 59sec), Respond to Daylight (enabled
or disabled) the calibration process must be run for the intelligent photocell to work.
Delay before ON or Delay before OFF timers, Scene Recall (ON or OFF).
SCHEDULER settings include:
DAY TYPES (defining times for each of the Modes to occur).
WEEKLY SCHEDULE (defining which Day Types are assigned to different days of the
week).
EXCEPTIONS (defining exceptions to the schedule).
VIEW ON CALENDAR (overview of what and when Modes happen).
Telejack connector
Control Unit
SL
L
L
N
Power Supply
Red dip switch (MUST be
switched towards centre of control)
to engage clock battery ON
IMPORTANT
ON
E: Connector diagram
Up to 5m
diameter
Up to 3m
NARROW
DETECTION (ND)
Mounting height
up to 12m
Perspective view -
ceiling mounted
Up
to
15m
SPOT
DETECTION (SP)
Mounting height
up to 20m
Perspective view -
ceiling mounted
Up to 28m
diameter
WIDE
DETECTION (WD)
Mounting height
up to 14m
Perspective view -
ceiling mounted
A: Detection diagrams
D: Mounting plate fixing
L
load
N
L
N
SL
load
L
N
L
N
SL
L
N
SL
L
N
SL
100-260 VAC
50 / 60 Hz
100-260 VAC
50 / 60 Hz
B: Wiring diagram, single PIR
C: Wiring diagram, multiple PIRs
L
load
N
L
N
SL
load
L
N
L
N
SL
L
N
SL
L
N
SL
100-260 VAC
50 / 60 Hz
100-260 VAC
50 / 60 Hz
Knock out mounting
holes or pre-drill
pilot holes.
For telejack entry from
above - knock out
central mounting hole
For side entry -
knock out side
mounting hole
Clip telejack into the device
then join device to mounting
plate via mounting clips