7.2 Troubleshooting DHW

Problem

Possible cause

Solution

Strainer in supply or return line clogged.

Clean strainer(s).

DHW circulation pump out of order or with
too low setting.

Check circulation pump.

Defective or clogged non-return valve.

Replace – clean.

No electricity.

Check.

Wrong setting of automatic controls, if any.

To adjust an electronic controller for
DHW, pls. note enclosed instructions for
electronic controller.

Scaling of the plate heat exchanger.

Replace – rinse out.

Defective motorized valve.

Check (use manual function) – replace.

Defective temperature sensors.

Check – replace.

Too little or no DHW.

Defective controller.

Check – replace.

DCW is being mixed with the DHW, e.g. in a
defective thermostatic mixing valve.

Check – replace.

Hot water in some taps but not in all.

Defective or clogged non-return valve on
circulation valve.

Replace – clean.

Tap temperature too high; DHW tap load
too high.

Thermostatic valve adjusted to a too high
level.

Check – set.

Scaling of the plate heat exchanger.

Replace – rinse out.

Temperature drop during tapping.

Larger DHW flow than the substation has
been designed for.

Reduce DHW flow.

Thermostatic control valve does not close

Temperature difference between DH
supply and DHW set point too low.

Lower the set point temperature or increase
the DH supply temperature.

Idle temperature too low (for stations
equipped with IHPT).

Set point too low.

Turn thermostat in (+) direction.

AQ082486478026en-010501/ LUK4044301

© Danfoss | 2023.10 | 23

Operating Guide Termix VVX-I with complete insulation

Содержание VVX-I

Страница 1: ...Electrical connections 9 5 0 Design 10 5 1 Design 10 5 2 Schematic diagram 11 6 0 Controls 12 6 1 Heating circuit 12 6 2 DHW temperature control 17 6 3 Other 18 6 4 Extras 20 6 5 Maintenance 21 7 0 Tr...

Страница 2: ...perature sensor Depending on the application different heat exchangers dimensioned for central or floor heating will be used Domestic hot water DHW The domestic hot water is prepared in the heat excha...

Страница 3: ...personnel and call for expert help immediately REACH All Danfoss A S products fulfill the requirements in REACH One of the obligations in REACH is to inform customers about presence of Candidate list...

Страница 4: ...g DH supply 2 District heating DH return 3 Heating HE supply 4 Heating HE return 5 Domestic hot water DHW 6 Domestic cold water DCW Connection sizes DH HE G int thread DCW DHW G int thread Dimensions...

Страница 5: ...during transport all substation connections must be checked and tightened before installation Unused connections Unused connections and shut off valves must be sealed with a plug Should the plugs requ...

Страница 6: ...ts of the bracket for the energy display and screw the two plugs supplied into the insulation front Mount the bracket for the display of the energy meter Mount the display calculator of the energy met...

Страница 7: ...Start up 1 Pump speed Set the pump to highest speed before start up 2 Start pump Start the pump and heat through the system 3 Open shut off valves The shut off valves should then be opened and the un...

Страница 8: ...at risk of seizure and any remaining warranty will be withdrawn Summer operation Switch off pump In summer the circulation pump must be switched off and the shut off valve to HE supply closed Running...

Страница 9: ...or sensor must be connected to the station on the terminal block under the electronic control Authorized electrician Electrical connections must be made by an authorized electrician only Local standar...

Страница 10: ...er DHW 14 Sensor pocket energy meter 41 Fitting piece energy meter 1 Summer valve 20 Filling drain valve 48 Air vent manual 4 Safety valve 26 Pressure gauge HE 63 Sieve 7 Thermostatic controller HE 31...

Страница 11: ...Pressure gauge 63 Sieve 9 Strainer 31 Differential pressure controller 74 IHPT controller 10 Circulator pump DHW Domestic Hot Water DCW Domestic Cold Water DH Supply District Heating Supply DH Return...

Страница 12: ...mperature controller 6 1 3 RAVK controller RAVK controller 25 65 C The temperature setting is as follows 1 25 C 2 35 C 3 45 C 4 55 C 5 65 C The values are intended as a guide Thermostatic control The...

Страница 13: ...mostats it is recommended that thermostats be set for minimum temperature in each room 6 1 5 Outside temperature sensor Outdoor sensors should be mounted so as to avoid exposure to direct sunlight The...

Страница 14: ...pressure proportional pressure or constant speed mode defined by the means of a smart user interface The variable speed modulating modes allow the pump to match its performance to the system requireme...

Страница 15: ...Constant pressure Auto adapt Proportional pressure 1 Proportional pressure 2 2 pipe systems Proportional pressure 3 MAX Constant pressure 1 1 pipe systems Constant pressure 2 Under floor heating Const...

Страница 16: ...6 1 9 HE pressure gauge The HE pressure gauge indicates the pressure of the HE system 16 Danfoss 2023 10 AQ082486478026en 010501 LUK4044301 Operating Guide Termix VVX I with complete insulation...

Страница 17: ...compensated temperature controller with integrated differential pressure controller The IHPT operates at its best at DH supply temperatures of up to 100 C By turning the handle for temperature settin...

Страница 18: ...3 2 Strainer Strainers should be cleaned regularly by authorized personnel The frequency of cleaning would depend on operating conditions and the manufacturer s instructions 6 3 3 GTU Pressure Equali...

Страница 19: ...n the fitting piece 3 Remove fitting piece Remove the fitting piece and replace it with the energy meter Do not forget the gaskets 4 Tighten connections After mounting of the energy meter remember to...

Страница 20: ...and fitting When mounting the hot water circulation directly on the controller the hot water circulation temperature will be equal to the idle temperature The idle temperature is a few degrees lower t...

Страница 21: ...erature and DHW temperature Connections Checking all connections for leakages Safety valves The operation of the safety valves should be checked by turning the valve head in the indicated direction Ve...

Страница 22: ...is at the normal level summer at least 60 C winter at least 70 C the differential pressure is equal to or higher than the normal local differential pressure in the DH network if in doubt ask the DH pl...

Страница 23: ...ed with the DHW e g in a defective thermostatic mixing valve Check replace Hot water in some taps but not in all Defective or clogged non return valve on circulation valve Replace clean Tap temperatur...

Страница 24: ...tion thoroughly Limiting of the return temperature adjusted too low Adjust according to instructions Defective radiator valves Check replace Uneven heat distribution in building because of incorrectly...

Страница 25: ...he system should feature electronic controls as well as return sensors Pump pressure too high Adjust pump to a lower level Air in system Vent the system Defective or incorrectly set radiator valve s S...

Страница 26: ...r to the applicable take back scheme for the recycling of electrical and electronic equipment Dispose of the product through channels provided for this purpose Comply with all local and currently appl...

Страница 27: ...8 0 Declaration 8 1 Declaration of conformity AQ082486478026en 010501 LUK4044301 Danfoss 2023 10 27 Operating Guide Termix VVX I with complete insulation...

Страница 28: ...28 Danfoss 2023 10 AQ082486478026en 010501 LUK4044301 Operating Guide Termix VVX I with complete insulation...

Отзывы: