
4.3 Wiring Procedures
Procedure
1.
Mount the pre-configured cable wires with the connectors on the fieldbus option. For cable specifications, refer to
.
e
3
0
b
g
7
9
2
.1
0
Illustration 3: Wiring
2.
Fix the cable to the metal base plate using the springs.
3.
Tie down the cable and route it with other control wires inside the unit.
NOTICE
Do not strip the Ethernet cable. Ground the shielded Ethernet cables through the RJ45 connector on the PROFINET
interface.
Installation
Installation Guide | VLT® PROFINET MCA 120
AN274237376992en-000101 / 130R0856 |
7
Danfoss A/S © 2019.03