
7.
Set the termination switch (shown in
Illustration 3.7
) on the fieldbus option to ON,
when the frequency converter is the last station
on the segment.
130BD876.10
1
2
4
3
1
LCP
2
LCP cradle
3
VLT
®
PROFIBUS DP MCA 101 option card
4
Connector plug
Illustration 3.2 Exploded View
130BD862.10
Illustration 3.3 Top Cable Entry: Option Mounted with
Connector Facing Up
130BD863.10
Illustration 3.4 Bottom Cable Entry: Option Mounted with
Connector Facing Down
Installation
Installation Guide
MG33C602
Danfoss A/S © 07/2015 All rights reserved.
7
3
3
Содержание VLT PROFIBUS DP MCA 101
Страница 2: ......
Страница 19: ...Index Installation Guide MG33C602 Danfoss A S 07 2015 All rights reserved 17...