4/T2
READY
RUN
TRIP
LOCAL
Exit
Reset
Menu
Store
2/T1
6/T3
1/L1
3/L2
5/L3
VLT
®
Soft Starter
1
2
4
3
5
e7
7h
a8
05
.1
0
Illustration 1: Overview of Network Connections
1
Soft starter
2
Network switch
3
IoT connection (MQTT/OPC UA)
4
Industrial Ethernet connection to programmable
logic controller
5
TCP connection to VLT® Motion Control Tool MCT
10. Refer to the VLT® Motion Control Tool MCT 10
Operating Guide for connection details.
AN428735951761en-000101 / 175R1188 | 7
Danfoss A/S © 2022.11
Introduction
PROFINET Module
Installation Guide