manualshive.com logo in svg
background image

Danfoss Heating

9

GB

6.0  Factory Reset

If for any reason you need to return the RZ1 unit to its factory reset 
state, or you need to wipe all network information from the unit it is 
advisable to perform a factory reset.  

1.   Press  PROG  to  place  the  receiver  in  PROGRAMME  mode  (Red 

LED illuminated continuously). 

2.  Press and hold CH1 button for at least 15 seconds.
3.   The PROG LED will flash rapidly orange and green.  Press and 

hold down the PROGRAMME button for at least 15 seconds.

4.   If reset was successful, the channel LEDs will show as RED and 

the PROG LED will flash slowly green to indicate that the unit is 
now in its factory reset state.

* if after step 1, the PROG button is not held down within 30 seconds, 
the unit will return to its previous state and the full reset will not have 
been applied.

Basic

Support

Binary switch

Support

Association

Control

Multi-instance

Support

Multi-instance Association

Control

Multi-command

Control and Support

Multi-channel

Control and Support

Protection Vn2

Support

Version                                             

Support

Wakeup

Control

Thermostat Set Point

Support

7.0  Z-Wave supported and controlled classes

Содержание RZ1

Страница 1: ...Z Wave Electronic Radio Frequency Receivers 1 Channel RZ1 and RZ1 HP User Guide Danfoss Heating MAKING MODERN LIVING POSSIBLE...

Страница 2: ...ng on 0845 121 7400 Danfoss can accept no responsibility for possible errors in catalogues brochures and other printed material All trademarks in this material are property of the respective companies...

Страница 3: ...GB danfoss Heating 3 GB Thank you for buying a Danfoss product...

Страница 4: ...0 Operating Modes 5 3 0 Initial Start Up 6 4 0 Understanding your RZ1 7 5 0 Manual Override 8 6 0 Factory Reset 9 7 0 Z Wave supported and controlled classes 9 8 0 Glossary 10 RZ1 and RZ1 HP Z Wave El...

Страница 5: ...ons of all kinds where a wired heating solution is undesirable or not possible Using 2 way communication each component of the system can talk to each other creating a network of Z Wave enabled device...

Страница 6: ...k between the RZ1 and another product please see section 4 of the installer manual If on power up you have the PROGRAMME LED illuminated in any other way proceed to page 9 to perform a full reset When...

Страница 7: ...Unbind button press request Green Normal Run Mode Green slow flash Factory Reset State Red Programme Mode Red slow flash Binding association in progress Orange Primary controller shift mode enabled Or...

Страница 8: ...nually switched on Press the channel button the channel will switch on and the Channel LED will flash GREEN ORANGE If the channel is not bound associated with a wireless device If the channel output i...

Страница 9: ...or at least 15 seconds 4 If reset was successful the channel LEDs will show as RED and the PROG LED will flash slowly green to indicate that the unit is now in its factory reset state if after step 1...

Страница 10: ...lour LEDs to indicate the different states the control can be in Programme State The RZ1 is ready to include or exclude other Z Wave compatible devices from the network Ready State When the RZ1 is in...

Страница 11: ...as a new primary network controller should the original primary malfunction SIS SUC ID Server This is a SUC controller which has been promoted by the network to become the ID server Any controller in...

Страница 12: ...Part No RZ1v03_User Danfoss Randall Ltd Ampthill Road Bedford MK42 9ER Tel 0845 1217 400 Fax 0845 1217 515 Email danfossrandall danfoss com Website www danfoss randall co uk...

Отзывы: