![Danfoss PVG 120 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/danfoss/pvg-120/pvg-120_service-manual_507214010.webp)
Examples of wiring block diagram
Example of a typical wiring block diagram using PVEH with neutral power off switch and fault monitoring
output for hydraulic deactivation.
Fault detection output
high=on
low=off
Alarm
logic
2)
Memory
3)
E1
E2
Output
A
N
D
O
R
U
DC2
Error
U
S
Neutral detection / Supply control
signal
≠
neutral
OFF
Delay
1)
U
DC2
Error
U
S
PVEH
with AMP
connector
PVEH
with AMP
connector
Hydraulic
deactivation
Neutral detection / Supply control
signal
≠
neutral
OFF
Delay
1)
PVE 1
PVE 2
Emergency
stop
Man present
switch
C
C
D
B
B
A
P301 318
A– Emergency stop / man present switch
B– PVE Fault monitoring signals
C– Neutral signal detection.
D– Hydraulic deactivation
System Control Logic e.g. PLUS+1® for signal monitoring and triggering signal for deactivation of the
hydraulic system.
W
Warning
It is the responsibility of the equipment manufacturer that the control system incorporated in the
machine is declared as being in conformity with the relevant machine directives.
Service Manual
PVG 120 Proportional Valve Group
Safety in application
10
520L0247 • Rev JA • May 2014
Содержание PVG 120
Страница 19: ...PVEH PVEO Service Manual PVG 120 Proportional Valve Group Installation 520L0247 Rev JA May 2014 19 ...
Страница 23: ...PVP Pump Side Module Service Manual PVG 120 Proportional Valve Group PVP 520L0247 Rev JA May 2014 23 ...
Страница 50: ...Service Manual PVG 120 Proportional Valve Group Order specification 50 520L0247 Rev JA May 2014 ...