Pilot-controlled PCVQ 

DN 100  - DN 250
PN 16 / PN 25

73696700

 DH-SMT/SI

 

VI.JA.G2.02  

©  Danfoss  11/2006

 

Table of Contents

Safety Notes 

 ...................................................... 

2

Definition of Application

  ............................ 

2

Description

 .......................................................... 

2

3.1  Construction ......................................................... 2

3.2  Mode of Operation  ........................................... 2

Technical Data

  .................................................. 

3

Scope of Delivery

 ............................................. 

3

Assembly 

 ............................................................. 

4

6.1  Prior to Assembly  ............................................... 4

6.2  Installation Position,  

Installation Place  ................................................ 4

6.3  When Installaling observe  ............................. 4

6.4  Impulse Tube Installation ................................ 4

6.5  Insulation  .............................................................. 4

6.6  Installation Scheme ........................................... 5

6.7  Assembly Drawings, Dimensions  ................ 6

Start-up

 ..................................................................

8

7.1  Required static Pressure  .................................. 8

7.2  Leak and Pressure Test ...................................... 8

7.3  Filling the System ............................................... 8

7.4  Start-up .................................................................. 8

7.5  Putting out of Operation ................................. 8

7.6  Flow Rate Adjustment ...................................... 9

7.7  Flow Adjusting Curves  ................................... 10

7.8  Sealing  ................................................................. 12

7.9  Adjustement of the Throttle Valves  .......... 12

7.10  Function Test  ..................................................... 12

Trouble Shooting

  .........................................  

13

Replacement of Valve,  
Actuator, Trims 

 ..............................................  

14

9.1  Dismounting and  

Mounting Actuator Valve  ............................. 14

9.2  Replacement of Trim Valve VFQ 21  ........... 16

9.3  Dismounting,  

Mounting Actuator AVP-F  ............................ 17

9.4  Replacement of Trim Valve AVP-F .............. 17

Содержание PCV-VFQ 21

Страница 1: ...be Installation 4 6 5 Insulation 4 6 6 Installation Scheme 5 6 7 Assembly Drawings Dimensions 6 7 Start up 8 7 1 Required static Pressure 8 7 2 Leak and Pressure Test 8 7 3 Filling the System 8 7 4 Start up 8 7 5 Putting out of Operation 8 7 6 Flow Rate Adjustment 9 7 7 Flow Adjusting Curves 10 7 8 Sealing 12 7 9 Adjustement of the Throttle Valves 12 7 10 Function Test 12 8 Trouble Shooting 13 9 R...

Страница 2: ...lates determine the use 3 Description 3 2 Mode of Operation The control unit consists of the PCV VFQ21 valve unit installed in the main pipe and AVP F installed as pilot controllers in the bypass In the bypass line a throttle element is installed in front of the pilot controller The controller keeps the differential pressure across the main valve flow restrictor on a constant level and restricts the...

Страница 3: ...ating plates and the PCV data sheet 5 Scope of Delivery DN 100 DN 125 Assembly kit valve unit PCV VFQ 21 Pilot controller DN 25 AVP F Throttling element Cu pipe Ø 6 1 1500 mm Cu pipe Ø 10 1 3000 mm DN 150 DN 250 Assembly kit valve unit PCV VFQ 21 Pilot controller DN 40 AVP F Throttling element Cu pipe Ø 6 1 1500 mm Cu pipe Ø 10 1 3000 mm ...

Страница 4: ...ce Installation is only permitted in horizontal pipelines with the actuators hanging in a downward position The controller may be installed in the supply as well as in the return line 6 3 When installing Observe direction of flow Design with welded ends Loads on the valve body and the throttle element by the pipes are not permitted 6 4 Impulse Tube Installation See installation scheme section 6 6 F...

Страница 5: ...uring mounting Bypasscontroller PCVQ Throttling element Throttling valve Throttling valve only by DN 150 250 Valve unit PCV VFQ 21 Pilot controller AVP F DH SMT SI VI JA G2 02 Danfoss 11 2006 5 Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 6 6 Installation Scheme Installation in the Return Line Installation in the Supply Line 6 Assembly ...

Страница 6: ...000 A 159 75 L1 DN 25 pipe Ø33 7 3 2 Material ST 35 8 not part of the delivery DN 25 SW 50 Pilot controller AVP F Throttling element 6 VI JA G2 02 Danfoss 11 2006 DH SMT SI Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 6 Assembly 6 7 Assembly Drawings Dimensions DN 100 DN 125 ...

Страница 7: ... 35 8 not part of the delivery DH SMT SI VI JA G2 02 Danfoss 11 2006 7 Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 6 Assembly continuous DN 150 DN 250 Nominal diameter DN 100 125 150 200 250 L1 mm 350 400 480 600 730 H1 530 530 619 647 697 H2 245 300 325 D2 263 380 D1 250 320 385 500 B 200 210 310 336 412 A 290 320 350 410 ...

Страница 8: ...or higher pressures you must Remove the impulse tubes 3 at the actuator and close the connections with a stopper Prior to any leak or pressure test the instructions in section 7 3 must be complied with 1 Pre condition Same pressure on both sides of the diaphragm If the pressure load is one sided the diaphragm chamber may have an excess pressure of 1 bar in comparison to the diaphragm chamber To av...

Страница 9: ...umber of rotations to the left 1 Unscrew cover 1 2 Loosen the counter nut 2 3 Choose diagram see section 7 7 Flow Adjusting Curves Observe effecitve pressure Δpb 0 2 or 0 5 bar see rating plate on the actuator AVP F 5 The adjusted flow rate can be verified by means of a flow rate measuring device Perhaps you need to re adjust the flow rate Care for an adequate differential pressure in the system 6 Tight...

Страница 10: ...N 200 kvs 450 DN 250 kvs 630 0 20 40 60 80 100 120 140 160 180 200 0 1 2 3 4 5 6 7 8 9 10 DN 200 DN 250 pb 0 2 necessary rotations of the adjustingthrottle 4 Example Ventil DN 200 required flow rate limitation 100m h Rotations for the adjusting throttle F low rate m 3 h DN 200 kvs 450 DN 250 kvs 630 0 20 40 60 80 100 120 140 160 180 200 220 240 260 0 1 2 3 4 5 6 7 8 9 DN 200 DN 250 pb 0 5 Rotations...

Страница 11: ...ly opened so that the flow rate is not restricted by a unit The adjustment can also be carried out via a bypass 3 5 Adjust the flow rate limitation by turning the adjusting throttle 6 Turning to the right 7 reduces the flow rate 3 Unscrew cap nut 4 4 Loosen the counter nut 5 Turning to the left 8 increases the flow rate 6 Observe the flow rate indicator 7 After having completed the adjustment tighten t...

Страница 12: ... turning it to the right by means of a wrench SW5 to its stop Then unscrew valve spindle by turning it to the left by approx 10 rotations Increase of damping e g necessary in case of pressure vibrations Screw in the valve spindle by turning it to the right Reduction of damping e g in case of a control that is too slug Unscrew the valve spindle by turning it to the left 7 10 Function Test Flow rate...

Страница 13: ...ge Flow rate is too low Valve plug of the pilot valve AVP F does not open Valve seat or plug is dirty or damaged trim is dirty 1 Remove impulse tube 2 Dismount actuator and trim Procedure see section 9 4 3 Clean seat and plug 4 If damaged replace trim or valve Valve plug of the pilot valve VFQ 21 does not open Valve seat or plug is dirty or damaged trim is dirty 1 Remove impulse tube 2 Dismount ac...

Страница 14: ... of the actuator 4 are not screwed to eachother Dismounting 1 Dismount impulse tubes 2 Support actuator below or by a second person as the springs 1 are pre stressed 3 Loosen union nut 2 4 Remove actuator Prior to assembly check cone 5 1 Clean cone prior to mounting 2 Check O rings for damages in case of damages replace cone see Spare Parts 3 Grease cone with high performance fitting component BARR...

Страница 15: ...re stressed Secure against dropping down before unscrewing 3 Screw the stem of the actuators 4 out of the valve stem 3 by turning the actuator to the left Mounting 1 Place actuator at the valve and push upward to press the spring package in the actuator together second person necessary 2 Carefully turn actuator to the right By this carefully screw in the stem of the actuator into the valve stem to...

Страница 16: ...the Danfoss service personnel Removing the trim Valves DN 100 125 1 Dismount actuator 1 see section 9 1 2 Unscrew hexagon head cap screw 2 3 Remove bonnet 3 4 Take out trim 4 Prior to installation Clean sealing surfaces 5 and socket 6 grease sealing surfaces with antiseize graphite petroleum Installing the trim Mounitng is carried out in reverse order Torque hexagon head cap screws 2 DN Torque Wre...

Страница 17: ...nting 1 Place actuator at the valve and align observe position of the impulse tube connections 2 Screw on union nut 1 and tighten torque 100 Nm AVP F DN 25 AVP F DN 40 Dismounting 1 Unscrew actuator see above 2 Unscrew trim 2 DN 25 with pipe tongs wrap gum strips around the trim DN 40 with wrench SW 55 3 Pull out trim Mounting Mounting is carried out in reverse order Only tighten with low torque s...

Страница 18: ...18 VI JA G2 02 Danfoss 11 2006 DH SMT SI Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 ...

Страница 19: ...DH SMT SI VI JA G2 02 Danfoss 11 2006 19 Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 ...

Страница 20: ...20 VI JA G2 02 Danfoss 11 2006 DH SMT SI Instructions Pilot controlled PCVQ DN 100 DN 250 PN 16 PN 25 ...

Отзывы: