background image

7369349-0 SIBC

VI.B1.Q2.6B

©

Danfoss 11/03

5

ENGLISH

1.0 Handling

1.1 Storage

- Storage temperature -20° to +65°C

dry; free of dirt

- The painting is only a primer,

intending to guard against rust
during stock or transportation.
Don't damage the paintwork.

- A desiccant or heating to prevent

condensation is necessary in
damp rooms.

1.2 Transport

- Transport temperature -20° to

+ 65°C.

- Protect against external force

(impact, vibration etc.).

- Don't damage the paintwork

1.3 Handling before installation

- If flange covers are fitted, remove

shortly before maintenance !

- Protect against atmospheric

conditions e.g. wetness (applicate
a desiccant).

- Correct handling protects against

damage.

2.0 Description

2.1 Scope of applications

Line regulating valves with a
defined characteristic for heating
and cooling systems. The plant
designer is responsible for
selecting the correct valve for the
purpose.

Note: Do not use MSV-F Plus valves

for handling steam!

2.2 Operating principles

The valve is closed (cone/seating

function) by turning the hand wheel
clockwise. Do not use tools to
increase the torque on the hand
wheel. The valve spindle is sealed
by an EDD double flexible seal
system. The stress on the EDD
double flexible seal system is
relieved by the return seal when the
valve is fully open. The position of
the plug is shown on the digital
display every complete turn and
every tenth and five-hundredths of a
turn.

3.0 Installation

3.1 General notes on installation

The following points should be taken
into account besides the general
principles governing installation work:

 - Remove flange covers if present.

- There must be no foreign bodies

inside the valve or piping.

- Pay attention to the direction of

flow: see markings on the valve

- Valves can be installed with the

spindle pointing in any direction,
but the preferred spindle position is
vertical.

- Reference for isolation:

If media-temperatures < ambient
temperatures - ask manufacturer.

- Installation upside down only if the

medium is clean.

- Centre packings between the

fianges.

- Connection flanges must mate exactly.
- If the valve is handling steam, the

piping must be laid with a gradient
to prevent water from accumulating
in pockets. Condensation traps are
needed to prevent water-hammer.

- All parts must be free from stress

after installation.

- The valve must not serve as a fixed

point. It must be carried by the
piping.

- Protect the valve from dirt,

especially during construction
work.

- Install compensators to  compensate

for thermal expansion of the piping.

- It is forbidden to heat the valve to

above its service temperature (see
data sheets), for instance by
welding, grinding, etc.

- To ensure that the valves function

correctly, the pipe run should be
straight for at least 2 x n.d.
upstream and 6 x n.d. downstream
of the valve.

3.2 Mounting the handwheel and

display in lagged pipe runs

Removing the handwheel
1. Close the valve by hand

("0" position).

2. Unscrew the cap.
3. Lift off the handwheel with the

attached digital display.

4. Insulation diameter:

DN 65 - 200 = 87 mm

Do not remove the insulation cap.

Fitting the hand wheel and display
1. Set the handwheel with the

attached digital display in place.

2. Position the display ("0" position)

on the side with the tapped hole.

3. Screw on the cap:

DN 15-200 = 15 Nm

Fault

Possible cause

Corrective measures

No flow

Valve closed.

Open valve.

Flange covers not removed.

Remove flange covers.

Little flow

Valve not sufficiently open.

Open valve.

Dirt screen clogged.

Clean / replace screen.
Relieve pressure first!

Piping system clogged.

Check piping system.

Valve difficult to move or

Wrong direction of rotation.

Turn in correct direction (anticlockwise to

cannot be opened

open valve).

Valve spindle leaking

EDD-special spindle seal.

Replace valve or bonnet.
Relieve the pressure in the system first!

Leakage across valve seat

Valve not properly closed.

Pull hand wheel tight without tools.

Seat or plug damaged by foreign particles.

Replaced valve. Consult supplier/manufacturer.

Relieve the pressure in the system first!

Pressure difference too high.

Check system pressure and pressure drop
(max. 

p =16 bar).

Reduce system pressure.

Medium contaminated (suspended solids).

Clean valve.
Install dirt screen upstream of valve.
Relieve the pressure in the system first!

Valve with stroke limiter

Stroke limiter on spindle stop has been

Turn stroke limiter upwards.

cannot be opened

tightened.

Flange broken between valve

Bolts tightened unevenly.

Realign piping and fit new valve !

and piping

Mating flanges not properly aligned.

Relieve the pressure in the system first!

Display does not show "0"/

Display not fitted properly after pipe was

Close valve, unscrew cap (23), remove

"0" when valve is closed

lagged.

hand wheel with attached digital display,
set display to "0"/"0" and reassemble in
reverse order. (See point 3.2).

False data recorded

False data displayed.

See point 3.2.

PFM 90/2000/3000

Observe operating= instructions for measuring
instrument used.

4.0 Throubleshooting

Содержание MSV-F Plus DN 15

Страница 1: ...7369349 0 SIBC VI B1 Q2 6B Danfoss 11 03 1 Instructions MSV F Plus DN 15 400 Fig 1 Fig 2 Fig 3 Fig 4 Fig 7 DN 25 Fig 8 DN 32 Fig 6 DN 20 Fig 5 DN 15 2D 6D...

Страница 2: ...2 VI B1 Q2 6B Danfoss 11 03 SIBC 7369349 0 Fig 9 DN 40 Fig 11 DN 65 Fig 10 DN 50 Fig 13 DN 100 Fig 12 DN 80 Fig 14 DN 125...

Страница 3: ...7369349 0 SIBC VI B1 Q2 6B Danfoss 11 03 3 Fig 15 DN 150 Fig 17 DN 250 Fig 16 DN 200 Fig 19 DN 350 Fig 18 DN 300 Fig 20 DN 400...

Страница 4: ...18 5 19 5 21 5 30 88 102 92 287 490 663 808 1 124 5 20 2 20 9 23 8 32 1 96 8 115 5 114 310 514 696 851 1 182 5 25 21 22 5 25 35 102 127 127 367 535 729 894 1 240 5 5 22 25 28 38 105 152 160 380 554 76...

Страница 5: ...Protect the valve from dirt especially during construction work Install compensators to compensate for thermal expansion of the piping It is forbidden to heat the valve to above its service temperatur...

Страница 6: ...n Funktion ist vor dem Ventil eine gerade Rohrstrecke vom zweifachen Rohrdurchmesser vor dem Ventil und vom sechsfachen Rohrdurchmesser nach dem Ventil vorzusehen 3 2 Montage des Handrads und der Digi...

Страница 7: ...rie Il est interdit de chauffer la vanne au dessus de sa temp rature de service voir la fiche technique par exemple lors d op rations de soudage etc Afin d assurer la vanne un bon fonctionnement la tu...

Страница 8: ...h vat nad jeho provozn teplotu viz datov list nap klad za elem sva ov n zbrou en apod K zaji t n spr vn funk nosti ventilu m b t pr b h trubky v okol ventilu p m alespo v d lce 2 n d d n jmenovit sv t...

Страница 9: ...nta u instalacji zawory nie mog by podgrzewane powy ej temperatury pracy Poprawna praca zaworu wymaga odpowiedniej d ugo ci odcink w prostych 2 x DN przed i 6 x DN za zaworem 3 2 Monta pokr t a i wska...

Страница 10: ...10 VI B1 Q2 6B Danfoss 11 03 SIBC 7369349 0 1 0 1 1 20 65 1 2 20 65 1 3 2 0 2 1 MSV F Plus 2 2 EDD 3 0 3 1 4 0 EDD 0 0 3 2 3 2 PFM 90 2000 3000 2 6 4 3 2 0 65 200 87 0 15 200 15...

Страница 11: ...dyne Saugokite vo tuv nuo purvo ypa atliekant statybos darbus Instaliuokite kompensatorius kad b t kompensuojamas terminis vamzdyno i sipl timas Draud iama kaitinti vo tuv iki auk tesn s negu leistina...

Страница 12: ...12 VI B1 Q2 6B Danfoss 11 03 SIBC 7369349 0...

Отзывы: