User Guide
|
Intelligent Purging System (IPS 8) for Ammonia - Technical data, installation and use
12 | BC344024774466en-000201
© Danfoss | DCS (ms) |
2021.03
.
21HL1
21HL2
21HL3
PURGING
Progeco srl
MODEL
WIRING DIAGRAM
ELECTRIC SUPPLY
FULL LOAD CURRENT
Industrial control panel for general use
LARGEST MOTOR
FLA
LARGEST RESISTANCE
RLA
SCCR CURRENT
CONSTRUCTION YEAR
ENCLOSURE
RATING
DANFOSS INTELLIGENT
PURGING SYSTEM (IPS 8) – NAM
RIV19E01
1PH + N/GRD
230V 60Hz
6,2A
4,19A
0,24A
18kA
03 / 2020
TYPE 12
Via Laghi, Calcinelli (PU)
www.progecoautomazione.it
Installation
Lifting Procedure
The Danfoss IPS 8 must be installed in
accordance with locations recommended in the
Connection locations and Connection points
sections of this document.
The unit has a enclosure, Type 12 and must be
installed indoor only with ambient temperature
ranging from -10 °C to 43 °C / 14 °F to 109 °F).
Avoid installation in direct sunlight as this may
lead to excessive sunlight exposure and ambient
temperatures above allowed limits. For ambient
temperatures below -10 °C (14 °F) the air purger
must be installed in a heated and ventilated area.
The unit must be installed in a non-ATEX/Ex-zone
atmosphere as the purger unit is not explosion proof.
The purger unit should be kept in an upright
position at all times - from receipt to final
installation.
Use all 4 lifting eyes (Fig. 11) and suitable lifting
gear during installation. Weight of IPS: 125kg
(276 lbs).
Install the unit on an even horizontal base 0.05
to 1.1 meter (2 to 43 in) above a service platform
with sufficient support and allowing the purger
subframe to be bolted to the support (see
example in Fig. 12). Maintain recommended
distances in all directions (Fig. 12) to allow fan
cooling and servicing.
Always leave the unit off for at least 12 hours
from finished installation to first time power up.
Electrical work must comply to national
and local electrical codes.
It is important that the support
construction is level to ensure the
internal liquid trap is properly filled.
Angle to horizontal < 2 degrees
Fig. 11
Fig. 12 Installation dimensions
All 4 lifting eyes must be positioned correctly, to match the actual used lifting gear
All 4 lifting eyes must be used
* For easy access to the main switch
and servicing, the Purger unit shall be
installed between 0,05 to 1,1 m (2 to 43 in)
above service platform level.
Min. 300 mm
Min. 900 mm
Observe:
IPS 8 must not be placed inside a closed
in-closure. At least two sides should
have no walls in front of IPS 8
A
A
1051 mm
7
0
3
Min. 900 mm
Min. 500 mm
Purging pipe OD 17.2 mm
for rubber hose to water bath.
Do not unscrew restrictor
inside pipe. Risk of purging
high NH3 concentration.
32 mm
Min. 4 00 mm
1051 mm
Min. 500 mm
Min. 900 mm
Min. 400 mm
32 mm
M
in. 300 mm
446 mm