background image

Danfoss FT1312 Hose Proof Test Stand Operators Manual 

4 | Danfoss FT1312 Hose Proof Test Stand Operators Manual | 2023.06.

AQ452153740268en-010101

Operating Instructions

PREFILLING 

1.  Close the air shut-off valve. Adjust the air regulator to zero pressure by turning the valve handle on top of the regulator in a counterclockwise 

direction until no turning resistance is felt.

2.  Open the cabinet of the tester and place the hose assembly to be tested on the aluminum rack of the tester.
3.  Connect the umbilical hose assembly to the hose assembly to be tested using the appropriate adapter combination. Umbilical hose has a -8 

JIC swivel fitting on its terminal end.

4.  Ensure that the high pressure dump valve is completely closed.
5.  Open the water shut-off valve and fill the assembly a/lowing the tap water to force the air from the hose assembly through the non-capped 

end.

6.  When the sample is completely filled, shut off the water and cap or plug the open end of the hose assembly. 

PRESSURIZING 

1.  Close the cabinet and latch both clasps securely. DO NOT ATTEMPT TO PRESSURE TEST THE HOSE ASSEMBLY WITH THE CABINET DOOR OPEN 

OR WITH THE LATCHES NOT SECURE.

2.  Reopen the water shut-off valve to supply ample water to the pumping unit during pressurization.
3.  Open the air shut-off valve.
4.  While monitoring the test pressure gauge, adjust the air regulator valve clockwise allowing the pumping action to begin. Steadily increase 

air pressure until the test pressure is approaching, then back off the air pressure until the pumping slows greatly. When the test pressure is 
reached, back off the air pressure just enough to stop the pumping action.

5.  The test assembly should remain pressurized at the proof test pressure for one minute. During this time the assembly should be observed 

through the transparent Lexan lid. Pinhole leaks or seeping fittings may not be immediately apparent, so careful observation is important.

6.  Once the test pressure has been obtained, tighten the locknut on the regulator. Subsequent assemblies can be pressurized to the test pres-

sure by merely opening the air shut-off valve on the pump. The air regulator will only require readjusting when a new test pressure is required.

TEST PRESSURE RELEASE

1.  Close the air shut-off valve on the water pump.
2.  Close the water shut-off valve located on the water pump.
3.  Open the high pressure dump valve to release the water pressure in the test sample.

REMOVING THE ASSEMBLY

1.  WAIT UNTIL ALL PRESSURE IS REMOVED FROM THE SAMPLE! This will be indicated by zero pressure indicated on the pressure gauge and no 

water draining from the pressure discharge port in the tester.

2.  Open the cabinet and remove the umbilical hose and test tooling from the tested assembly.
3.  Drain the remaining water from the tested assembly. It is recommended that all hose assemblies be blown dry with compressed air.

Содержание FT1312

Страница 1: ...Operator s Manual Danfoss FT1312 Hose Proof Test Stand...

Страница 2: ...assembly equipment with powered moving components Safety glasses must be worn at all times when using any Danfoss assembly equipment Read and understand the owners and operators manual before attempti...

Страница 3: ...floor capable of holding 750 pounds An area 9 5 feet by 6 feet should be allocated for the machine and working area Remove the clear plastic air lubricator bowl adjacent to the air pressure regulator...

Страница 4: ...djust the air regulator valve clockwise allowing the pumping action to begin Steadily increase air pressure until the test pressure is approaching then back off the air pressure until the pumping slow...

Страница 5: ...cleaning the see through lid with clean soapy water Do not use petroleum or chemical solvents on the see through lid Use only mild detergent PROBLEM SOLUTION Test pressure not attainable during operat...

Страница 6: ...599 32 SAE 45 Swivel 4 2000 6 4B 2081 12 6S 2022 5 8S 900599 4 5 2000 6 5B 2081 12 6S 2022 12 8S 900599 5 6 2000 6 6B 2081 12 6S 2022 12 8S 2001 6 6B 2082 6S 8 2000 12 8B 2022 12 8S 900599 8 10 2000 1...

Страница 7: ...sure Port Plug or Cap 4 FF2031T0404S 2022 4 8S FF9767 04S 6 FF2031T0604S 2022 4 8S FF9767 06S 8 FF2031T0806S 2022 6 8S FF9767 08S 10 FF2031T1008S 2022 8 8S FF9767 10S 12 FF2031T1208S 2022 8 8S FF9767...

Страница 8: ...4 Danfoss FT1312 Hose Proof Test Stand Operators Manual 8 Danfoss FT1312 Hose Proof Test Stand Operators Manual 2023 06 AQ452153740268en 010101 FT1312 Hose Proof Test Stand...

Страница 9: ...Cap Screw Stainless Steel 8 8 FT1312 3 8 Handle backing Plate 2 9 FT1312 3 9 10 24 Stainless Steel Jam Nut 8 10 FT1312 3 10 Clamp 2 11 FT1312 3 11 Latch Plate 2 12 FT1312 3 12 Latch Plate Mounting Pad...

Страница 10: ...Danfoss FT1312 Hose Proof Test Stand Operators Manual 10 Danfoss FT1312 Hose Proof Test Stand Operators Manual 2023 06 AQ452153740268en 010101 FT1312 Power Unit...

Страница 11: ...ly 1 6 FT1312 2 5 6 Bracket 1 7 FT1312 2 5 7 Valve H P 1 8 FT1312 2 5 8 Nipple Assembly 1 9 FT1312 2 5 9 Pump 1 10 FT1312 2 5 10 Air Valve Shut Off 1 11 FT1312 2 5 11 Muffler 3 8 NPT 1 12 FT1312 2 5 1...

Страница 12: ...ed to use tap water eliminating the need for a special test fluid Compact power unit is air driven Tests assemblies up to 2 inches inside diameter 6 spiral wire Cabinet construction withstands hose as...

Страница 13: ...16S 20 2040 16 20S 2040 12 16S 2046 20 20S 2082 20S 24 2040 20 24S 2040 12 16S 2040 16 20S 2022 8 8S 2046 24 24S 2082 24S 32 2040 24 32S 2040 12 16S 2040 16 20S 2040 20 24S 2022 8 8S 2046 32 32S 2082...

Страница 14: ...ariety of equipment and applications around the world We proudly engineer to support a sustainable future for tomorrow To learn more please visit http www danfoss com en about danfoss our businesses p...

Отзывы: