background image

•  the gutter/pipe diameter

Gutter/pipe diameter

No. of cable lines [n]

75 - 120 mm

1

120 - 150 mm

2*

150 - 200 mm

3

* Two lines of 30 W/m (60 W/m) require minimum 

Ø120 mm downpipe and a moisture sensitive con-

troller, e.g. ECtemp 850 .

Design  

temperature

Heat  

density

ECsnow 20T (EFTCC)

[°C]

W/m2

[n]

[C-C in cm]

0 to -5

200 - 250

1

9

6 to -15

250 - 300

2

7 - 8

16 to -25

300 - 350

2

6

26 to -35

350 - 400

3

5

Design  

temperature

Heat  

density

ECsnow 30T (EFTCC)

[°C]

W/m2

[n]

[C-C in cm]

0 to -5

200 - 250

-

-

6 to -15

250 - 300

1

12

16 to -25

300 - 350

2*

10

26 to -35

350 - 400

2*

8

Design  

temperature

Heat  

density

ECsafe 20T (EFTPC)

[°C]

W/m2

[n]

[C-C in cm]

0 to -5

200 - 250

1

9

6 to -15

250 - 300

2

7 - 8

16 to -25

300 - 350

2

6

26 to -35

350 - 400

3

5

Installation summary

Install ECtemp 850 sensor, if any, in gutter accord-

ing to sensor manual.

Extend sensor cables and cold leads, and place 

connections in a dry place. Seal all penetrations 

through e.g. roofs and walls.

Inform the end user to check for and remove 

sharp edges, leaves, and dirt from the heated roof 

and gutter systems every autumn.

Содержание ECaqua

Страница 1: ...Ice and snow melting Roof and gutters Installation Guide electricheating danfoss com ...

Страница 2: ...llation step by step 5 2 1 Calculating C C distance 5 2 2 Planning the installation 5 2 3 Preparing the installation area 6 3 Installing elements 6 3 1 Installing heating elements 7 4 Applications 7 4 1 Frost protection of roof and gutters 7 5 Optional settings 9 Table of Contents ...

Страница 3: ...ust always be installed according to local building regulations and wiring rules as well as the guidelines in this installation manual Any other installation may hamper element functionality or constitute a safety risk and will void the warranty Elements must always be connected by an authorised electrician using a fixed connection De energize all power circuits before installa tion and service Ea...

Страница 4: ...e be stated in any electrical documentation following the installation Never exceed the maximum heat density W m2 or W m for the actual application 1 2 Installation guidelines Prepare the installation site properly by removing sharp objects dirt etc Regularly measure ohmic resistance and insula tion resistance before and during installation Do not lay heating elements under walls and fixed obstacl...

Страница 5: ...e of one cable to the centre of the next C C cm Area m2 x 100 cm Cable length m or C C cm Cable output W m x 100 cm Heat density W m2 Max C C distance for roof and gutter systems is 10 cm Heating cable bending diameter must be at least 6 times cable diameter The actual cable length may vary 2 230V 400V C C cm W m 20 W m W m 25 W m W m 30 W m 5 400 500 7 5 267 333 400 10 200 250 300 12 5 160 200 24...

Страница 6: ...onnected to separate floor sensors and thermostats For single conductor cables both cold leads must be connected to the connection box 2 3 Preparing the installation area Remove all traces of old installations if appli cable Ensure that the installation surface is even stable smooth dry and clean If necessary fill out gaps around pipes drains and walls There must be no sharp edges dirt or foreign ...

Страница 7: ...ts with the heating cables facing up When the heating mat reaches the area bound ary cut the liner net and turn the mat before rolling it back Extending cold leads Avoid extending cold leads if possible Wire cold leads to e g junction boxes or cable wells Be aware of power loss in the cable according to local regulations 4 Applications 4 1 Frost protection of roof and gutters 1 2 3 4 5 6 7 1 Roof ...

Страница 8: ...snow 30T EFTCC C W m2 n C C in cm 0 to 5 200 250 6 to 15 250 300 1 12 16 to 25 300 350 2 10 26 to 35 350 400 2 8 Design temperature Heat density ECsafe 20T EFTPC C W m2 n C C in cm 0 to 5 200 250 1 9 6 to 15 250 300 2 7 8 16 to 25 300 350 2 6 26 to 35 350 400 3 5 Installation summary Install ECtemp 850 sensor if any in gutter accord ing to sensor manual Extend sensor cables and cold leads and plac...

Страница 9: ...icable adjust the temperature limit in accord ance with the manufacturer s recommendations in order to prevent damage Thermostat Max load Frost protection of roof and gutters ECtemp 316 16A 7 C On 3 C ECtemp 330 16A On 3 C ECtemp 610 10A On 3 C ECtemp 850 2 x 15A Melting 3 C 1 1 1 2 8 3 4 5 6 7 1 Heating cable 2 Thermostat 3 Sensor 4 Screen 5 RCD 6 All pole switch 7 Fuse 8 Junction box VIAMZ102 ...

Отзывы: