24
2.6.3.
Figure
The in
2.Gro
Figure
The P
+POS
NOTIC
Follow t
ground
.
DC Term
e 2.10
: DC termi
ncoming PV c
ounded
Term
e 2.11: Fuse boar
PV conductor
S
and
–NEG
te
CE
the guideline
ing and tight
minals
nal blocks
conductors s
minal
inside th
rd in the Stringbo
s go through
erminal block
es from the co
tening torque
hall be termi
he Stringbox
ox
h the DC switc
ks in the lowe
onduit manu
e.
nated at the
.
F
F
1
f
2
f
N
b
N
c
ch in the Strin
er inverter co
Installation Gu
ufacturer rega
1.Unground
F1, F2 and F3:
F4:
Ground fus
1. Ungrounde
for the ungrou
2. Grounded T
for the ground
N:
Receptacle f
between phase
N-N:
Terminal
conductor.
ngbox, and a
ompartment.
uide DLX UL serie
arding conne
ded
Terminal
:
DC fuse holde
se holder (GFD
ed Terminal:
T
unded PV cond
Terminal:
Term
ded PV conduc
for monitoring
es and neutral
block for the n
are then term
es
L00410624-0
ection,
l
and
ers.
DI).
Terminal block
ductors.
minal block
ctors.
g the voltage
l.
neutral
minated at the
01
k
e
Содержание DLX 2.0 UL
Страница 3: ......
Страница 4: ...IV Installation Gu uide DLX UL serie es L00410624 0 01...
Страница 6: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 17: ......
Страница 18: ......
Страница 21: ......
Страница 25: ......
Страница 26: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 36: ......
Страница 44: ......
Страница 55: ......
Страница 58: ......