manualshive.com logo in svg
background image

8 | © Danfoss | 2019.04

VI.LI.K1.02 

AFQM 2, AFQMP 2

ENGLISH

Safety Notes

Prior to assembly and 

commissioning to avoid injury of 

persons and damages of the 

devices, it is absolutely necessary to 

carefully read and observe these 

instructions.
Necessary assembly, start-up, and 

maintenance work must be performed 

only by qualified, trained and authorized 

personnel. 
Prior to assembly and maintenance work 

on the controller, the system must be:

- depressurized, 

-  cooled down,

-  emptied and 

- cleaned.

Please comply with the instructions of the 
system manufacturer or system operator.

Disposal instruction

 

This product should be dismantled 
and its components sorted, if possible, 
in various groups before recycling or 
disposal.

Always follow the local disposal regulations.

Definition of Application

The controllers AFQM 2 and AFQMP 2 

are used in connection with electrical 

actuators AMV(E) 55/56 and 65x for flow 

limitation and temperature control of 

water and water-glycol mixtures for 

heating, district heating and cooling 

system.

The technical data on the rating plates 

determine the use

Mounting 

Permissible Installation Positions

All installation positions are allowed

Electrical actuator

 

Installation positions for electrical 
actuators AMV(E) have to be observed 
as well. Please see relevant Data Sheet.

Place and Scheme of  

Installation 

 Return flow

 Supply

Valve Installation 

1.  Install strainer 

 in front of valve.

2.  Rinse system before installing valve.

3.  Observe flow direction 

 on the valve 

body.

 

Flanges 

 in the pipeline system must 

be in parallel direction, the sealing 
surfaces must be clean and 

undamaged.

4.  Install valve.

5.  Tighten screws crosswise in 3 steps up 

to the maximum torque.

Insulation 

 

DO NOT insulate the electrical 
actuator!

The pressure actuator may be 

insulated up to a medium temperature of 100 °C.

Actuator and Valve Mounting 

AMV(E) 55/56

1.  Remove the connector 

 by release the 

bolt of actuator using Allen key 4 mm.  

2.  Tighten union nut 

, torque  3 Nm. 

3.  Install the connector 

 again to 

connect the spindle of actuator and 

valve. 

Read Instructions of AMV(E) 55/56 for 

wiring and setting.

AMV(E) 65X

1.  Install the actuator to the valve.  

2.  Tighten the nuts 

 to fix the ring.

3.  Connect stems 

.

4.  Tigten the connector 

 again to 

connect the spindle of actuator and 

valve.

Read Instructions of AMV(E) 65x for wiring 

and setting.

Leak and Pressure Tests 

 

Prior to pressure tests it is 
absolutely necessary to open the 
valve.

Non-compliance may cause damages at 

the controller AFQM 2/AFQMP 2.

Open valve by means of the actuator: 

A

 

AMV(E) 55/56

Adjust valve position manually using an 

Allen key (See instructions of AMV(E) 55/56 

for manual operation).

B

 

AMV(E) 65x

Manual adjustment of the valve depend 

on type of the AMV(E) 65x actuator  (See 

instructions for particular type of AMV(E) 

65x for manual operation).

 

When the impulse tube is installed, the 

max. operating pressure of *16 bar 
(PN 16) and *20 bar (PN25) must 

NOT be exceeded.

*DN depended

Non-compliance may cause leaks at the 

actuator.

In case of higher test pressures, remove 

impulse tubes 

 at the valve.

Close connections at the valve with plug 

G1/4 ISO 228 

.

Observe nominal pressure 

 of the valve.

Max. test pressure is 1,5 × PN

Filling the System First  

Start-up 

 

First, ensure that valve is open. To open 
the valve see section 5 and read 
instructions for relevant  type of the 

actuator.

The pressure 

 at the valve output may 

exceed the pressure 

 at the valve input 

only insignificantly. Non-compliance may 

cause damages at the Controller.

Differential Pressure Setting 

❽ 

(only for AFQMP 2)

Set-point range see rating plate 

 

2.  Set flow rate on a motorized valve part to 

about 50 %.

3. Adjustment:

• Turning to the right 

 increases the set-

point (stressing the spring) 

• Turning to the left 

 reduces the set-point 

(un-stressing the spring) 

• Set the differential pressure to the level 

needed to reach desired maximum flow

4.  The set-point adjuster 

 may be sealed. 

5.  Release the not yet used pointer 

, move it 

to the set position and fix it with the screw

Flow Limitation Adjustment 

The connector between valve and actuator 

should be released and the actuator 

removed before the adjustment of flow 

to prevent any possible damage to the 

actuator.

The adjustment of the flow is made by 

adjusting the valve stroke.

There are 2 possibilities:
1.  Adjustment with adjustment diagram 

see 

 and 

2.  Adjustment with heat meter, see 

.

Содержание AFQM 2 PN16

Страница 1: ...PN 16 25 40 Operating Guide AFQM 2 PN 16 25 40 DN 65 125 AMV E 55 56 AFQM 2 PN 16 25 40 DN 65 250 AMV E 65x AFQMP 2 PN 16 25 DN 65 125 AMV E 55 56 AFQMP 2 PN 16 25 DN 65 250 AMV E 65x AFQMP 2 AMEi 6 i...

Страница 2: ...2 Danfoss 2019 04 VI LI K1 02 AFQM 2 AFQMP 2 AUTO 2 4 mm 5 95 RH no condensing MAINTENANCE FREE T 100 C T 100 C...

Страница 3: ...Danfoss 2019 04 3 VI LI K1 02 AFQM 2 AFQMP 2 A AMV E 55 56 AMV E 55 65x B AMV E 65x AMV E 55 56 AMV E 65x...

Страница 4: ...FQM 2 AFQMP 2 p 0 1 0 7 bar Type AFP 2 Code Nr 003G5650 p 1 3 bar Tmax 150 C Area cm2 80 Turn till end Hold Fix Release for turn Pull out SW46 Max 100 120 Nm 30 turns 2x SW36 SW36 Note setting can be...

Страница 5: ...evolutions DN 100 p b 0 2 bar p b 0 5 bar 0 50 100 150 200 250 0 5 10 15 20 25 flow m 3 h No of revolutions DN 150 p b 0 2 bar p b 0 5 bar 0 50 100 150 200 250 300 350 0 5 10 15 20 25 30 flow m 3 h No...

Страница 6: ...No of revolutions DN 100 p b 0 1 bar p b 0 7 bar 1 revolution 360 turns indicator 0 20 40 60 80 100 120 140 160 0 5 10 15 20 25 flow m 3 h No of revolutions DN 125 p b 0 1 bar p b 0 7 b a r 0 50 100 1...

Страница 7: ...96 334 462 200 353 391 497 250 365 403 555 DN L H1 H2 H3 Valve weight kg mm PN 16 PN 25 PN40 65 290 355 505 540 49 51 56 80 310 355 515 540 58 60 67 100 350 390 540 570 91 93 105 125 400 395 575 610 1...

Страница 8: ...ring and setting AMV E 65X 1 Install the actuator to the valve 2 Tighten the nuts to fix the ring 3 Connect stems 4 Tigten the connector again to connect the spindle of actuator and valve Read Instruc...

Страница 9: ...d 4 The adjusting screw may be sealed drilling Adjustment with heat meter 1 Operate actuator manually or by control signal to retract the stem See the manual operation in instructions of AMV E 55 56 6...

Страница 10: ...10 Danfoss 2019 04 VI LI K1 02 AFQM 2 AFQMP 2...

Страница 11: ...Danfoss 2019 04 11 VI LI K1 02 AFQM 2 AFQMP 2...

Страница 12: ...is also applies to products already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed All trademarks in this material a...

Отзывы: