Arrays and assembly procedures
Inspections before setup
Before setting up the array, carry out a visual inspection of all
system components for faults. This also includes the loudspeakers
and in particular the rigging parts of the cabinets (Front and
Splay/Rear links).
Damaged components must be withdrawn from use immediately.
Please follow the instructions given in
4.2 XSL TOP array
4.2.1 Remarks and limitations
NOTICE!
In combination with the Z5778 XSL Top mounting frame, a
maximum 12 x XSL TOP cabinets can be flown.
4.2.2 Order of assembly
1. Attach the Mounting frame to the first TOP cabinet
To attach the frame to the first cabinet, proceed as follows:
1. Prepare the Front and Splay links of the first cabinet as
described in
Chapter 2.4 "Rigging mechanism of the
2. Attach the frame onto the cabinet until the Front links of the
cabinet fit into the slots at the front of the frame.
3. Insert the Locking pins on both sides.
4. At the rear, insert the first Locking pin into the
[0°] hole.
5. Insert the second Locking pin into the
[2°] hole.
2. Suspend the assembly
1. Suspend the assembly according to your onsite requirements.
2. Lift the assembly to a suitable working height.
3. Add further TOP cabinets
1. Prepare the Front and Splay links of the next cabinet as
described in
Chapter 2.4 "Rigging mechanism of the
2. Preset the desired splay angle as described in
Chapter 2.4.3 "Setting splay angles for XSL TOP cabinets"
d&b Z5778/Z5779 Rigging manual 1.2 en
18