Assembly Procedures
ground condition is suitable.
roof tubes to them accordingly.
3. Make each group of frame straight and assemble the roof purlins and horizontal walls in turn.
Make sure that all screws are tightened enough.
4. Assemble the cross tubes in front and back wall including the tensioning tube for covers at the
bottom.
roof cover onto the bottom tensioning tubes at the both side of frame as per Figure 5.
6. Then please put the rope in the sleeves at the two ends of roof cover into rings on the base
the bottom of the covers to the bottom tensioning tubes.
8. Please connect and tighten ropes between roof cover and front & back cover.
Your assembly is complete.
I
Содержание Titanium Tent
Страница 1: ...12 12 2016 6x12x3 5x5 5m Manual for Titanium Tent ...
Страница 7: ...2M 6M 12M 6x12x3 5x5 5M Schematic drawing of placement for base flange ...
Страница 10: ...11A 10 19 19 Frame connection hint M14x30 bolt with nut ...
Страница 11: ...14 14 7 8 18 6x12x3 5x5 5M Illustration for installation and tensioning both sides of roof cover ...
Страница 15: ...17 7 8 9B 9C 6x12x3 5x5 5M stake peg ...
Страница 16: ......