STAGE 5
End section installation
In the variant of
installation of the
greenhouse without a
foundation, marking
of axes is made on the
ground in accordance
with
fig. 5.1
and holes
70 cm deep are dug for
foundation stay braces
with supports.
In the variant of
installation of the
greenhouse on a
foundation in accordance
with f
ig. 5.1
, cleater
angles are mounted to
the foundation for the
subsequent fastening on
them bottom ends of arcs
in accordance with fig.
5.2 without foundation
stay braces.
The end section is lifted
and placed in a vertical
position on the prepared
place.
200*
2042
2132
L=4084+2132хN*
2132
2042
fig. 5.1
Fig. 5.2
5000
200*
84
100
200*
200*
45
42
100
*N -number of sections of the gr
eenhouse, excluding end sections, r
ef. p.2
2н
STAGE 6
Extension of the frame
length.
Fig. 6
4
5
2н
Assembled power arc (or
other end wall, depending
on the needed length
of the greenhouse) is
brought to the assembled
end section at the
distance of the main
runner and joined to
it with the use of main
runners
2 and 2н
align
the side flanges of shapes
(fig. 6).
It is recommended to
connect the outermost
and middle runners first,
using a stepladder.
Next power arc is joined
to the power arc that has
already been connected,
and so on all the arcs are
alternatively joined
INSTALLATION SEQUENCE
INSTALLATION SEQUENCE