![Dancover TITAN Dome 320 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/dancover/titan-dome-320/titan-dome-320_manual_3496266006.webp)
Installation instruction
1. Foundation is assembled by using front end and back end parts of foundation (17) and
foundation side parts (15). All parts must be connected in such manner that it would form
a rectangle. Use foundation corners (18) and connect all these parts together by using bolts
M5-12 (26), M5 nuts (29). Don’t tighten, just screw in loosely with hand (1.1-1.4 pic).
1.4 pic.
2 pic.
2. Measure the diagonal length of foundation
(example 2). Both diagonals must be equal in
length. If diagonals are equal – tighten the screws
of foundation (2 pic).
5
For greenhouses TITAN Dome larger than 10 m2,
foundation connection plates (19) are used for
foundation extension. They must be attached by
using bolts M5-12 (26) and nuts M5 (29) (1.5 pic).
If greenhouse's length is 6 m - foundation must be
connected between: 4 m (15) + 2 m foundation
extension (16).
1.5 pic.
1.1 pic.
1.2 pic.
1.3 pic.
pits
(15)
(17)
If greenhouse’s length is 8 m – foundation must be connected between: 4 m (15) + 4 m
foundation extension (16).
If greenhouse’s length is 10 m – foundation must be connected between: 4 m (15) + 4
m (15) + 2 m foundation extension (16).