Fig. 8.1
Fig. 8.2
Fig. 8.3
Fig. 8.4
9.
The assembled and fixed upper bars (No. 2) are tightened to the upper parts of the side
–
lower bars (No.
1) with M5-12 bolts (27) and M5 nuts (30) with the bar connection plates (12) (Fig. 9.1
–
9.3).
Fig. 9.1
Fig. 9.2
Fig. 9.3
10.
Fix the side (No. 1) and the upper bars (No. 2) to each other by fixing profiles for sides and a ridge (No.
3) with M5-20 bolts (28) and M5 nuts (30). The same action is to be carried out with all bars (Fig. 10.1
–
10.2).
Содержание TITAN Classic 480 Series
Страница 1: ...12 04 2019 for Greenhouse TITAN Classic 480 Manual ...
Страница 17: ......