background image

F

ig

u

re

 2

  

P

o

sition o

f B
as

F

langes

S

te

p

 #

1

 -

-S

E

C

U

R

IN

G

 B

A

S

E

 F

LANGES

S

it 

th

b

u

ild

in

g

 b

o

x

es

 in

 th

ch

o

se

n

 lo

ca

tio

n

. R

em

o

v

al

l t

h

co

m

p

o

n

en

ts

 f

ro

m

 p

ac

k

ag

in

g

 to

 e

n

su

re

 a

ll

co

m

p

o

n

en

ts

 a

re

 p

re

se

n

t b

y

 c

h

ec

k

in

g

 w

ith

 th

P

ar

t L

ist.

D

ia

g

o

n

al

s a

re

 e

q

u

al

F

ig

u

re 

3

A

Fi

gu
re 

3

 s

how

s, eac

h

 b

ase

fl

ang

is e
qu
ipp
ed

 w

it

two

st

ak

p

eg

s.

Front

5

5

5

20
00

20
00

6

000

2000

2000

1400

1400

1200

4000

9

Be
g

in by d

et

er

mi
n

ing 
ex

ac

t l

o

ca

ti

on o

f t

h

fou
r (

4

) c

o

rn

er

s o

f t

h

e bu
il

d

ing. M

ar

fr

on
t e

dg

and 
si

d

e-

to

-s

id

w

id

th o
f a

ss

em

b

ly

on g

round. 

Dr
iv

ali

gn
m

en

t st

ak

es

 in

to 

th

e g

round ou

tsi
d

e o

f t

h

m

ar

k

ing
s, 

and d

raw

 a

li

gn
m

en

t s

tr

ing
s a

long bo

th 

end
s a

nd

si

d

es

 o

f t

h

e bu
il

d

ing 
to 

th

e d

im
en

si

on
s s

ho
w

in 

F

igu
re

 2. Th

e ou
tli

n

e o

f t

h

st

ring
s w

ill

 re

p

re

se

n

t t

h

fin

al

 lo

ca

ti

on o

f t

h

e b

ase

fl

ang
es

. Th

in

iti

al

 lo

ca

ti

on o

f eac

C

o

rn

er

 Ba
se

 F

la

ng
es

 (

5

) is

 cr

iti

ca

l t

th

ali

gn
m

en

t a

nd 
fi

t o

f t

h

fra
m

co

m

pon

en

ts

 a

nd

cov
er.

Lo
ca

te

 th

e L

ef

t C

o

rn

er

 Ba
se

 F

la

ng

and 
Ri
gh
t C

o

rn

er

 Ba
se

 F

la

ng
e(

5

). 

Sec

u

re

 th

e b

as

fl

ang
es

 w

it

S

ta

k

Pe
g

s (Par
t #

9

).

M

ea

su

re

m

en

ts

 s

ho
w

in 

F

igu
re

 2 
are
 to 

th

ce

n

ter

 o

f t

h

e up
righ
t s

o

ck

et

s on 
eac

Ba
se

 F

la

ng
e.

Th

S

h

elt

er

 m

u

st

 b

sec

u

re

to 

fi

rm

 s

u

rface

 th

at

 ca

rece

iv

and 
re

ta

in 

aug
er

s a

nd p

eg

s f

ir

ml

in po

siti

on. Th

sh

elt

er

 s

hou

ld

b

in

st

al

le

d on 

FIR


G

R

OUND

, no

t on 

SW

A

M

P

S

O

F

T

/W
ET 

G

R

OUND

. Th

Ba
se

 F

la

ng
es

 m

u

st

 b

sec

u

re

so 

th

ey 

ca

n

not
 be

m

ov
ed. 
Ar
ch

es

 are
 te

n

si

on
ed 

at

 th

ei

r b

as

as

 th

ey 

in

ser

t i

n

to 

th

Ba
se

 P

la

te

 s

o

ck

ets

20
00

5

5

5

5

Содержание ST03850

Страница 1: ...21 04 2023 Manual for Arched Storage for Animals 4x6x2 4m...

Страница 2: ...cause the tent to collapse In the event of rain there is a risk of rain puddles building up on top of the roof of the tent Heavy rain puddles can cause the roof to collapse It is your responsibility t...

Страница 3: ...17mm Sockets or Box Wrench Large Flat Head Screwdriver 2lb maul or Sledgehammer 4 Foot Level 14 Step Ladder Stake String for aligning Base Plates Frame Assembly procedure 1 Prepare location and place...

Страница 4: ...ver from the inside with a broom or soft brush to clear cover Main Cover Lacing the poly rope that secures the main cover to the bottom rail of the frame assembly should be checked and adjusted as nee...

Страница 5: ...2 6A Upper standing tube at back panel 1 7 Lower standing tube at front panel 2 7A Lower standing tube at back panel 1 8 Side wall rail tube 12 8A Back wall rail tube 4 8A Door Rail 2 8B Rail on the...

Страница 6: ...6 7 8A 8B Figure 1 Sketch Size W 4 L 6 H2 4M 12 3A 8A 13 1 1 1 2 2 3 3 3A 3A 3A 4 5 5 5 5 5 5 5A 6A 8A 8B 8 8 8...

Страница 7: ...ends and sides of the building to the dimensions shown in Figure 2 The outline of the strings will represent the final location of the base flanges The initial location of each Corner Base Flanges 5...

Страница 8: ...Assemble the front panel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts comple...

Страница 9: ...right corner base flange insert a hexagonal bolt and nut to prevent it from popping out of the socket while assembly continues Next stand first interior arch up to repeat insertion into Base flanges I...

Страница 10: ...top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of frame Having another person inside frame on a ladder to assist in getting Roof Cover over f...

Страница 11: ...Figure 10 Installation of the Back Cover...

Страница 12: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Отзывы: