Illustration for installation and tensioning for both sides of the roof cover
Hint for tensioning front and rear
folds. Put the ropes in the roof
cover pocket through the rings
and pull hard the ropes. At the
same time tidy rumple on the fold
gradually. When the cover is well
on the folds tie a knot with the
ropes on the rings.
8x9x3x5 used for this illustration
Содержание ST03810
Страница 1: ...21 05 2015 8m Series TITANIUM TENT...
Страница 5: ...21 05 2015 Part drawings for 8m series Titanium...
Страница 6: ......
Страница 7: ......
Страница 8: ...Figure 2 Figure 3 Figure 4 8x16 2x3x5m 8x9x3x5m...
Страница 9: ......
Страница 10: ......
Страница 12: ......