Step 8)
Now you are ready to start to
stand the pagoda up. Start by
lifting one side, the legs should
slowly fold down as you lift, but
you may need to help them.
Once the legs are fully extend-
ed lock the in place with the
locking plate and refi t the M10
bolt.
Now with the tent up on two
legs you can tension the roof
cover by turning the ring on the
bottom of the Spider/ tensionor
in a clockwise direction.
Содержание Pagoda Marquee UNICO 6x6m
Страница 1: ...6x6m Pagoda EventZone ...
Страница 7: ...Completed main frame ready for roof tubes ...
Страница 16: ......