21
Y11
Y11
L21C/21D
L21C/21D
L21C/21D
L21C/21D
Z01
Z01
Z01
Z01
M2
H
Y11
Y11
L21C
L21C
L21C
L21C
L21D
L21D
L21D
L21D
L18D
After Assembly
Outside face
Slide 2xS02 into L18D, positioned
100mm away from each edge.
Secure S02 using M02 bolts,
then rotate the wheels
to ensure free movement.
* This is the method of
adjusting the door height.
First the glazing panels should be loosely retained by the bar
capping profiles L21C and L21D. Next tap the bar capping gently into
position with a rubber mallet, then fix the bar capping securely with Z01 screws.
Содержание Orangery GH152005
Страница 1: ...28 11 2019 for Orangery 3 81x3 77x2 5m Manual...
Страница 2: ...PRODUCT SIZE LxWxH 381x377x250cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instructions...
Страница 3: ...CONTENTS 1...
Страница 31: ...2 1 L13 W01 29 L07A 2 2 L07A L13 L13 1 1 1 1...
Страница 49: ...47 Y15 Y9 Y9 Y14 Y16 Y17 Y7 Y7...