background image

2

 

Statement

 

 

Dear Customer! 

 

May we congratulate you on buying new Greenhouse.  

We feel sure that by following the detailed assembly instructions, you will find as much 

pleasure in actually building the greenhouse as the many hours you will spend on your 

greenhouse in the future. The assembly instructions are a combination of text and illustra-

tions and no technical knowledge is required for the erection of the greenhouse. The 

frames are numbered and packed separately corresponding to the succession in the as-

sembly instructions  

Assemble one section at a time. However, bolts and various fittings for all sections will be 

found in pack of instructions.  

Each pack is specified in the list of components. All detailed illustrations are marked with a 

symbol

 

 

Guarantee  

We grant a comprehensive guarantee that covers replacement or repairs of defective parts 

due to material or manufacturing fault. The guarantee does not cover transport, assembly,

freight etc. Glass is not covered by the guarantee. The guarantee is invalid if the green-

house is not assembled according to these instructions.

 

Winter Protection 

Our greenhouse is constructed with frame dimensions up to 50% stronger than most of 

the competing products. We still recommend you to protect your greenhouse during the 

winter.  

Supporting the roof ridge at the centre of the greenhouse.  

Removing greater snow loads.  

Taking precautions against snow falling down from, for instance a roof.   

Preventing the wind from damage the greenhouse door and windows.   

Foundation  

The base is maintenance free and, of course, all fittings are included. Remember to order 

concrete pipes and concrete at you local dealer, as these are not included in the delivery.

 

Maintenance 

Complaints 

 

Grease doors, hinges and door track  

Clean the gutter for leaves etc  

Adjustment of windows  

Replacement of broken glass  

Clean the greenhouse with disinfectant before and after the growing season

 

We put severe demands on quality to secure that you get faultless products.  

However, should a complaint occur, we kindly ask you to contact the dealer, from whom 

you have bought the greenhouse, To secure a quick service you should specify the extent 

of the defect by means of the list components in the assembly instructions.  

Содержание GH170000

Страница 1: ...07 05 2021 for Orangery 4 45x4 45x2 52m Manual...

Страница 2: ...Assembly Instructions For Sliding Door Walk in Greenhouse Orangery...

Страница 3: ...id if the green house is not assembled according to these instructions Winter Protection Our greenhouse is constructed with frame dimensions up to 50 stronger than most of the competing products We st...

Страница 4: ...re that the greenhouse is square before starting to glaze We recommend the frames to be degreased with acetone before glazing We recommend using working gloves while glazing An assistant make the job...

Страница 5: ...4 Base Base Base Base Base Anchor legs Corner ite Fixing tabs M6x10 M6 M6x10 Crop Washer GTA10 1x4392 3x2958 2x747 2x1464 9 6 19 58 77 19 13 1 2 3 1 2 3...

Страница 6: ...sembling aluminium base the end trough centers of seven legs should match both end trough centers of side sills and front rear sills at the same time side sills front rear sills Please match seven cor...

Страница 7: ...ize 1600 2043 2043 446 2896 733 1656 1656 1712 1456 2856 QTY 2 1 1 1 1 4 1 1 2 1 1 a1 a2 a3 G m1 G m2 a20 G p1 Size M6x10 M6 M6x15 QTY 30 34 4 1 2 34 1 1 7268 Front Gable 2 3 4 5 5 6 7 8 9 7001 7001 7...

Страница 8: ...2 7268 7002 7015 a3 3 4 5 6 7001 7009 a1 7009 7015 a1 a1 7009 7002 7001 7211 a1 7009 G m2 7015 1 7001 7268 a3 8 9 7206 7020 a1 a2 7211 7212 G m1 7206 7 7211 7002 7020 a1 a2 7020 7021 Section View 702...

Страница 9: ...210 7213 7214 7015 Size 1600 2043 2043 2436 2896 2884 1656 1656 1712 QTY 2 1 1 1 1 2 1 1 2 a1 a2 a3 G m1 G m2 a20 G p1 Size M6x10 M6 M6x15 QTY 25 30 5 1 2 30 1 1 7024 2 4 5 6 6 7 8 9 7001 7001 7002 70...

Страница 10: ...9 Rear Gable 4 5 7001 7210 a1 7210 7015 a1 7 7001 7213 a1 7210 G m2 7015 8 7213 7002 a1 a2 9 a1 a2 7207 7213 7214 G m1 1 2 3 6 7210 7002 a1 7001 7024 a3 7024 7002 7015 a3 7207 7024 a3...

Страница 11: ...tra bolt into channel for eave cantilever use in advance Side wall a1 a2 a3 a20 Size M6x10 M6 M6x15 QTY 38 55 17 55 7026 7029 7034 7036 7401 7402 7403 7404 7405 7406 7407 7408 7409 Size 4330 1732 4353...

Страница 12: ...11 5 6 a3 a2 7401 7404 7405 7408 7409 Side wall 5 6 7 8 9 10 11 12...

Страница 13: ...a2 a3 a2 7036 7029 7029 13 15 17 14 16 13 14 15 16 17 7409 7029 7029 7405 7404 7408 7036 7404 7036 7029 a3 a2 7408 7029 Note Bolts need to be slid into cor ner bars for eave canti lever brac ing use l...

Страница 14: ...rail one more for the eave cantilever bracing between the roof and the side one more for the vent slam bar attaching If vent position to be decided 2 Prior to tightening the roof bars to structure Pl...

Страница 15: ...14 Roof 4 5 6 7 8 9 10 11 7412 7413 7422 7420 7423 7421 7422 7420 7423 7421 7244 7244 7244 7244 7244 7244 7244 7049 7045 7046 7046 7045 7252 7252 7252 7252 7427 7427 7415 7415...

Страница 16: ...15 Roof 4 5 6 7 8 9 7244 7036 7252 7427 7252 7244 7036 7244 7244 7420 7412 7034 7412 7034 7049 7049 10 11 7415 7422 7423 7045 7046 m3 7415 7420 7421 7427 m3...

Страница 17: ...16 Roof 12 13 7251 7037 7244 7244 7244 7036 14 12 14 13 7037 7037 7415 7420 7421...

Страница 18: ...56 7056 4 7054 7056 a2 a1 7053 7054 7055 7056 7057 7067 a1 a2 a4 a7 a10 p3 a20 Size 739 718 701 593 300 M6x10 M6 3 9x8 M4x8 M4 QTY 1 1 1 2 1 2 8 8 2 6 6 2 8 1 1 1 1 1 7053 7244 7244 2 3 2 3 7244 7053...

Страница 19: ...18 Vent 7055 7055 7057 5 6 5 6 7 7055 7057 a7 a10 7055 7056 8 p3 a4 9...

Страница 20: ...a5 G p5 FLUFF 7064 m10 a15 a16 a20 Size 1938 1938 1938 715 715 715 M6x10 M6 3 5x19 1938 350 M6x12 6 QTY 2 1 1 2 2 2 2 12 13 28 2 2 2 4 1 1 12 7059 7058 7063 7061 7062 1 2 3 1 2 3 7058 7063 7061 7058 7...

Страница 21: ...20 Door 4 5 7 8 9 8 9 10 7065 4 6 10 11 7021 7021 G p5 a5 m10 7064 7064 m10 11 6 a15 a16 a2 a15 round head M6x16 door stop bolt and gasket should be fixed in center of door track rail...

Страница 22: ...g V panel into Alu Profile channel 7422 7423 VL VR 4mm Glass Note PVC capping bars were pushed in place from both top and bottom in diagonal direction together If you assemble it from one side by one...

Страница 23: ...c 1599 c 2030 c 2043 c 2436 c 2436 c 2043 c 2030 c 1599 c 8 3 8 c 8 3 8 c 8 3 8 c 8 3 8 c 1655 c 1655 c 1599 c 2030 c 2030 c 1599 c 1586 c 1575 c 759 c 747 c 747 c 759 c 1575 c 1586 c 1599 c 1599 f 2...

Страница 24: ...of c 1655 14 1586 2 1575 4 1026 6 955 2 759 4 747 4 Size GTA10 A4 700 x 35 438 6 B4 650 x 933 8 E4 700 x 1597 16 H4 700 x 631 4 I4 700 x 448 852 2 J4 700 x 61 465 4 K4 700 x 1666 6 L4 700 x 1037 2 TA4...

Страница 25: ...PVC capping bar which ex ceeding Alu Profile Sliding slope PVC cap ping bar into Alu Profile gap Two slope PVC capping bar connect together with out gap Please trim two slope PVC capping bar edge on t...

Страница 26: ...25 Downpipe P8 P9 M0 P1 P0 P2 a8 a2 a20 mm 1000 200 M6x16 M6 QTY 3 3 3 3 3 3 3 3 3 P8 P9 M0 P0 a8 a2 7mm 15mm...

Страница 27: ...The li of parts Description 1 Front gable 2 2 Rear gable 1 3 Side wall 1 4 Roof 1 5 Vent 4 6 Door 2 7 Base connector 1 8 Glass panels 1 9 Tools 1 10 Assembly Instruction 1...

Страница 28: ...I For more information please visit www dancovershop com l l l l l l l l l l l Dancover A S Lyngevej 16A N rre Herlev 3400 Hiller d Denmark Head office...

Отзывы: