Dancover CA119011 Скачать руководство пользователя страница 14

14 

 

 
 

5. CHECKS AND MANTAINANCE 

 

It  is  necessary  to  periodically  check  the  general  status  of  the  structure,  of  the  links  between 
components, of the hinges and the top cover. In case of holes or tears in the fabric, damages or 
cracks of metal components, it is necessary to contact the dealer.  
In particular, the fixing systems (strings) of the snails must be periodically verified. If some fissures 
and tears are present, the strings must be substituted. 
 
The top cover can be washed with neutral detergent and then rinsed with water. After cleaning, the 
fabric must be dried before being folded, in order to prevent mold.

 

 

 

 

6.  DISASSEMBLY 

 

Disassembling operations are done backward to the assembly.  
The  eventual  disposal  of  the  box  must  be  made  in  accordance  with  the  existing  environmental 
norms. 

 

 

Содержание CA119011

Страница 1: ...06 07 2017 for Folding Garage Car 2 5x5 4x2m Manual...

Страница 2: ...ic s characteristics 8 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the installation 10 3 3 Installation 10 3 3 1 Package opening 10 3 3 2 Squared holding devices pla...

Страница 3: ...nual you will find the instructions to correctly install the box understand the functions of the box and of the whole thereof correctly do the box scheduled maintenance processes take care of the basi...

Страница 4: ...it its use in these conditions can cause damages to people and things It is particularly important for safety not to hang or apply any type of load at the structure or at the top cover of the box In...

Страница 5: ...120x60 FOOT 6 PVC COVERSOL FABRITARP TOP COVER 7 ALUMINIUM LACQUERED RAL 9010 PLATE crosses 8 ALUMINIUM LACQUERED RAL 9010 PLATE tension bars 9 NYLON ROPE DIAM MM 5 10 STRING FASTENER HANDLE 11 HINGE...

Страница 6: ...6...

Страница 7: ...7 10 8 7 12 9...

Страница 8: ...rn cm Weft 16 yarn cm Fabric s weight Ca 400 gr m2 Tensile strength Warp Ca 120 DaN 5 cm DIN 53354 Weft Ca 130 DaN 5 cm Tearing resistance Warp Ca 5 5 DaN DIN 53363 Weft Ca 7 5 DaN Grip ISO 2411 Ca 6...

Страница 9: ...ting PVC Fabric s weight Ca 450 gr m2 Tensile strength Warp Ca 250 DaN 5 cm DIN 53354 Weft Ca 180 DaN 5 cm Tearing resistance Warp Ca 25 DaN DIN 53363 Weft Ca 25 DaN Hot cold resistance 70 C 30 C Fini...

Страница 10: ...ny permits required by local regulations appropriate ground 3 3 Installation Before starting the installation if electrical equipment utilization is needed make sure you do not work in wet areas use o...

Страница 11: ...by the customer in a parallel position photo 2 NOTE The fixation to the ground must be done according to the type of ground and the localization of the box 3 3 3 Box installation The central part of...

Страница 12: ...s must be screwed in the holes photo 5 and 6 The lateral crosses must be positioned photo 7 and 8 Only after this operation the uprights can be fixed to the feet photo 9 12 P H O T O 5 P H O T O 6 P H...

Страница 13: ...strong wind 4 BOX UTILIZATION Before using the box you need to check that installation and ground fixation operations have been carried out properly The snails can be opened and closed easily by simp...

Страница 14: ...articular the fixing systems strings of the snails must be periodically verified If some fissures and tears are present the strings must be substituted The top cover can be washed with neutral deterge...

Страница 15: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Отзывы: