6
7
Fig.1
Fig.2
manual
Assembly instruction
1.
2.
Determine the place of the vent sash.
Install two guides
05ф (fig.1)
in the
chosen place. The guides
05ф
are
installed on the beams in the pre-
drilled holes of the greenhouse.
Cut the window aperture
(fig.1)
for the
vent sash on the edges of the profile.
Tape the top and bottom cuts of the
polycarbonate.
Drill 4 holes Ø7 in the beams
(fig. 1).
Install right and left brackets on them.
(fig.2
), observing
their position on the holes
964
498
7
48
cutting line
right bracket
left bracket
05ф
05ф
outside view
12...14
12...14
12...14
12...14
manual
Assembly instruction
Cut both edges of the uppermost packing and
lower edges of upright packing after the edges
of the aperture
(fig.3)
3.
Fig.3
upright packing
upright packing
downmost
packing
downmost
packing
uppermost
packing
20мм
20мм
uppermost
packing
Содержание AC120070
Страница 1: ...for Ventilation Window for TITAN Peak 240 360 and TITAN Arch 196 Manual 11 02 2020...
Страница 2: ......