background image

3.

On each end of (no. 3), install the Leg (no. 1). Repeat step 1 for all frames.

4.

At this point stand up the front or back frame and add 7 male connecting pipes (no. 8). Then stand up

another frame and add 7 female connecting pipes (no. 2). For the remaining frames use the male 

connecting pipes (no. 8).

5.

Add the diagonals (no. 9) to the first and last legs (no. 1).

Note: Make sure all screws are tight. Do not over-tighten. 

6.

ROOF ASSEMBLY

Take the roof and place it over the structure. Make sure 

that the windows are on the two sides of the shelter, at 

front or at back as your choice. 

Tie all the ropes around the pipes. 

7.

SHELTER REINFORCEMENT

Before you install the floor brackets, make sure the 

distance between the legs is 18 feet wide.

Place the floor brackets (14) at each end of the shelter. 

Then drive in nails (15) into ground, gravel or asphalt. 

Other material surfaces require other types of anchoring 

(cement blocks, sand bags, screw and bolt, etc). Permanent 

anchors are not provided with this unit.

8.

DOOR INSTALLATION

Install doors at each end. Connect door with roof by velcro 

as shown. Use elastics (13) to attach the door to the roof 

with hooks (11). Close the end of hook on the elastic so it 

won’t fall on out. Use the rail hooks to attach door the door 

rails. When closing at the front, make sure all elastics are 

attached on the inside and outside of the shelters.

Содержание 5.4m Series

Страница 1: ...14 12 2017 for Garage Tent 5 4m Series Manual ...

Страница 2: ... building on the roof as heavy snow can cause the marquee tent to collapse In the event of rain there is a risk of rain puddles building up on top of the roof of the marquee tent Heavy rain puddles can cause the roof to collapse It is your responsibility to ensure rain puddles do not build up As a precaution make sure the roof of the marquee tent is stretched out properly and adequately over the s...

Страница 3: ...le door rail 5 6 7 8 6 Female door rail 5 6 7 8 7 T bar 5 6 7 8 8 Male brace 63 21 28 35 42 9 Diagonal 80 4 4 4 6 10 Rope 4 4 4 4 11 S hook 16 16 16 16 12 Big door rail hook 24 24 24 24 13 Elastic bungee 16 16 16 16 14 Floor bracket 8 8 8 8 15 Nail 16 16 16 16 16 Carriage bolt 1 6 7 8 9 17 Carriage bolt 2 11 13 15 17 18 Carriage bolt 4 27 33 38 43 14 12 2017 ...

Страница 4: ...s Part no Description 6m 7 5m 9m 10 5m 19 Wing nut 55 66 77 88 20 Big plastic cap for legs 10 12 14 16 21 Small plastic cap for cross pipe 14 14 14 14 22 Roof 1 1 1 1 23 24 Set with door right and door left 2 2 2 2 14 12 2017 ...

Страница 5: ... your hands during assembly We recommend that you wipe metal parts clean with a mixture of warm water and dish detergent prior to assembly Should your hands become dirty simply wash with soap and water ASSEMBLY INSTRUCTIONS 1 Take a Center Arch no 4 and on each end of it assemble a Corner Arch no 3 Secure the Male and Female Door no 5 and no 6 to the Arch no 3 2 Slide the Rail Hooks over the Door ...

Страница 6: ... the ropes around the pipes 7 SHELTER REINFORCEMENT Before you install the floor brackets make sure the distance between the legs is 18 feet wide Place the floor brackets 14 at each end of the shelter Then drive in nails 15 into ground gravel or asphalt Other material surfaces require other types of anchoring cement blocks sand bags screw and bolt etc Permanent anchors are not provided with this u...

Страница 7: ......

Отзывы: