Dancover 0 217 700 32 Скачать руководство пользователя страница 11

11 

 

NOTE:  

 The  packaging  material  disposal  is  at  user’s  charge,  who  will  perform  it  in 
accordance with existing environmental norms. 

 

 

 

3.3.2 Squared holding devices placement 

 

The  squared  holding  devices  must  be  anchored  to  the  ground  (previously  prepared  by  the 
customer) in a parallel position (photo 2). 

 

 

 

 

 

 

 

 

NOTE:  

 The fixation to the ground must be done according to the type of ground and the 
localization of the box. 

 

3.3.3 Box installation 
 

 

The  central  part  of  the  box  must  be  opened  paying  attention  not  to  open  the  snail  parts  (let  the 
strings fastened to the handles). 
 

 

The lateral uprights must be fixed in the feet contained in the squared holding devices (photo 3 and 
4).

  

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

O  

 

O  

 

O  

 

Содержание 0 217 700 32

Страница 1: ...06 07 2017 for Folding Garage Car 2 5x5 4x2m Manual...

Страница 2: ...ic s characteristics 8 3 INSTALLATION 10 3 1 Handling and transport 10 3 2 Place and requirements for the installation 10 3 3 Installation 10 3 3 1 Package opening 10 3 3 2 Squared holding devices pla...

Страница 3: ...nual you will find the instructions to correctly install the box understand the functions of the box and of the whole thereof correctly do the box scheduled maintenance processes take care of the basi...

Страница 4: ...it its use in these conditions can cause damages to people and things It is particularly important for safety not to hang or apply any type of load at the structure or at the top cover of the box In...

Страница 5: ...120x60 FOOT 6 PVC COVERSOL FABRITARP TOP COVER 7 ALUMINIUM LACQUERED RAL 9010 PLATE crosses 8 ALUMINIUM LACQUERED RAL 9010 PLATE tension bars 9 NYLON ROPE DIAM MM 5 10 STRING FASTENER HANDLE 11 HINGE...

Страница 6: ...6...

Страница 7: ...7 10 8 7 12 9...

Страница 8: ...rn cm Weft 16 yarn cm Fabric s weight Ca 400 gr m2 Tensile strength Warp Ca 120 DaN 5 cm DIN 53354 Weft Ca 130 DaN 5 cm Tearing resistance Warp Ca 5 5 DaN DIN 53363 Weft Ca 7 5 DaN Grip ISO 2411 Ca 6...

Страница 9: ...ting PVC Fabric s weight Ca 450 gr m2 Tensile strength Warp Ca 250 DaN 5 cm DIN 53354 Weft Ca 180 DaN 5 cm Tearing resistance Warp Ca 25 DaN DIN 53363 Weft Ca 25 DaN Hot cold resistance 70 C 30 C Fini...

Страница 10: ...ny permits required by local regulations appropriate ground 3 3 Installation Before starting the installation if electrical equipment utilization is needed make sure you do not work in wet areas use o...

Страница 11: ...by the customer in a parallel position photo 2 NOTE The fixation to the ground must be done according to the type of ground and the localization of the box 3 3 3 Box installation The central part of...

Страница 12: ...s must be screwed in the holes photo 5 and 6 The lateral crosses must be positioned photo 7 and 8 Only after this operation the uprights can be fixed to the feet photo 9 12 P H O T O 5 P H O T O 6 P H...

Страница 13: ...strong wind 4 BOX UTILIZATION Before using the box you need to check that installation and ground fixation operations have been carried out properly The snails can be opened and closed easily by simp...

Страница 14: ...articular the fixing systems strings of the snails must be periodically verified If some fissures and tears are present the strings must be substituted The top cover can be washed with neutral deterge...

Страница 15: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Отзывы: