![background image](http://html1.mh-extra.com/html/dallmeier/das-100/das-100_installation-and-commissioning-manual_3319236023.webp)
23
Dallmeier electronic GmbH & Co.KG
6
Commissioning and reboot
6.1
Commissioning
IMPORTANT
Possible loss of all recorded data.
Refer to the instructions contained herein for
starting the storage system (DMS/DLS in
conjunction with DAS).
1. Connect the power pack to the power supply.
2. Switch on the two power packs.
3. The fans for the power packs will start to turn and the status
LED will be lit (green).
4. The DAS will now boot and initialize the hard disk drives. This
process may take up to two minutes.
5. After the boot and initialization process has been completed the
DAS is ready for use. This status is indicated by three signals
through the system speaker.
6. Now start the connected DMS/DLS recorders.
Fig. 6-1
Содержание DAS-100
Страница 4: ...4 DAS 100 200 Dallmeier electronic GmbH Co KG...
Страница 16: ...16 DAS 100 200 Dallmeier electronic GmbH Co KG...
Страница 22: ...22 DAS 100 200 Dallmeier electronic GmbH Co KG...