TIME PErIoD SWITCH-oN
at this point, the second time period must be programmed.
The sequence to be followed is the same and is repeated as for the 1
ST
TIME PErIoD SWITCH-oN.
on this occasion it is only necessary to enter the time, for example start at 15:00 and Stop at 22:00 and to activate the days
Saturday and Sunday by setting them at "oN".
CoNTroLS ProCEDUrE:
Press key 5 for a few seconds, until the
text SET CLoCk appears.
Press key 3 once, the SET CHroNo text
will appear.
Set
cLOck
Set
cHrOnO
1
ST
TIME PErIoD SWITCH-oFF
Using keys 2 - 3, enter the time “12:00”,
which corresponds to the switch-off
time of the 1
st
time period. The SToP
Prg1 text will appear followed by the
time set.
To confirm and continue programming,
press button 5. Press button 4 to go
back to the previous parameter.
StOp
prg1
12:00
ENaBLE CHroNo
Press key 5, ENaBLE CHroNo and oFF
will appear.
Press key 3 to activate or deactivate the
CHroNo function. Select oN.
enABLe
cHrOnO
On
ENaBLE 1
ST
TIME PErIoD DaYS
To do this, use keys 3 and 5 in the
following way:
key 5 - allows to scroll the various
days, the text with the day of the week
will appear, followed by oFF
Use key 3 to enable-disable (oN/oFF)
all days.
MOnDAy..
prg1
On-OFF
Press key 5 to confirm and continue
programming.
The scrolling text
STarT Prg1 oFF will appear.
StArt
prg1
OFF
Press key 5 to confirm and continue
programming.
The text STarT Prg2 oFF will appear.
StArt
prg2
On-OFF
1
ST
TIME PErIoD SWITCH-oN
Using keys 2 - 3, enter the time “08:00”,
which corresponds to the switch-on
time of the 1
st
time span. The STarT
Prg1 text will appear followed by the
time set.
To confirm and continue programming,
press button 5. Press button 4 to go
back to the previous parameter.
StArt
prg1
08:00
2
ND
TIME PErIoD SWITCH-oN
at this point, the second time period
must be programmed.
The sequence to be followed is the
same and is repeated as for the 1
ST
TIME PErIoD SWITCH-oN.
StArt
prg2
15:00
J
WHen tHe WeekLy prOgrAMMer iS Active, A BOx OF tHe reLAtive icOn WiLL AppeAr On tHe
cOntrOL BOArD.
prOgrAMMing exAMpLe
Let's suppose that the weekly programmer function is to be used and 2 time periods are to be used in the following way:
1st time period: from 08:00 to 12:00 every day of the week excluding Saturday and Sunday
2nd time period: from 15:00 to 22:00 only Saturday and Sunday.
engLiSH
Содержание Stefy
Страница 2: ...2 ...
Страница 33: ...33 ...
Страница 59: ...59 ...
Страница 85: ...85 ...
Страница 111: ...111 ...
Страница 137: ...137 ...
Страница 138: ...138 ...
Страница 139: ...139 ...