background image

Dake Corporation 

724 Robbins Road  

Grand Haven, MI 49417 

www.dakecorp.com

 

 

907005 

 

14 

REV112019 

 

GENERAL ASSEMBLY 

 

 

 

Содержание 150H

Страница 1: ...com customerservice dakecorp com DAKE HAND OPERATED HYDRAULIC PRESS Model 150H INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure to follow...

Страница 2: ...RRANTY 2 RETURN REFUND POLICY 4 SAFEGUARDING THE POINT OF OPERATION 5 SPECIFICATIONS 6 SAFETY 6 SET UP 8 FILLING PRESS WITH OIL 8 OPERATION 9 CONTROLS 9 MAINTENANCE 10 LUBRICATION 10 TROUBLESHOOTING 1...

Страница 3: ...he repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the m...

Страница 4: ...llation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid fre...

Страница 5: ...by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item receive...

Страница 6: ...on safeguarding system The standard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of the hydra...

Страница 7: ...ecific machine SAFETY This is the safety alert symbol When you see this symbol on your press be alert to the potential for personal injury Employer is responsible to perform a hazard PPE assessment be...

Страница 8: ...ed employees as per OSHA Hydraulic Relieve all hydraulic pressure before servicing the press Turn the red release handle to relieve the pressure Spring Pressure Clamp ring on bottom of piston must be...

Страница 9: ...the cable drum a Place the table pins under the table before releasing the hoist crank when positioning the table channels for cable tracking servicing or set up for desired work operating Be sure al...

Страница 10: ...ally operated with up and down motion IMPORTANT Always pump the piston down before the nose piece comes in contact with the work Damage to the piston may occur if not pumped before meeting the work Re...

Страница 11: ...to stay in position by itself After long periods of operation it may be necessary to install new pump packings PRESS NOT HOLDING PRESSURE This condition is nearly always caused by dirt under the press...

Страница 12: ...tact 4 Piston Packing is worn or damaged 5 Gauge is defective 1 Replace Pump Plunger leather 2 Remove and clean Check Balls and Seats 3 Reseal Ball on Seat 4 Replace Piston Packing 5 Replace Gauge Oil...

Страница 13: ...2 Nylock 28297 1 14 Handle Socket Pin 594 3 15 Valve Rod 1129 1 4 Washer 12 Flat 43629 1 16 Valve Rod Packing Nut 576 1 5 Pump Plunger Leather 599 1 17 Valve Rod Packing 987 8 6 Check Valve Spring 57...

Страница 14: ...5 Handwheel 701760 1 26A Clamp Ring Assembly 1557 1 35 Cylinder 1528 1 26B Piston Bumper 1574 1 38 Cylinder Gasket 1577 1 27 Oil Seal 1578 1 44 Air Vent Tube 632 28 Pipe Plug 1 4 NPTF 1567 1 F1 Hex Ca...

Страница 15: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 907005 14 REV112019 GENERAL ASSEMBLY...

Страница 16: ...er 1568 4 59 Cable 19 1562 1 42 Roller Shaft 1570 2 60 Cable Clamp 583 4 Retaining Ring 43978 4 61 Table Spacer 1553 4 43 Dake Name Plate 81002 1 F3 Flat Washer 1 4 43631 1 45 Handwheel 10631 1 F4 Scr...

Страница 17: ...72 Drum Key 745 1 66 Worm Key 746 1 73 Worm Gear 743 1 67 Worm 744 1 74 Cable Drum 740 1 68 Hoist Frame 739 1 75 Retaining Ring 43982 1 69 Hex Cap Screw 1 2 13 x 2 1 2 Not Shown 43353 1 Complete Table...

Отзывы: