
REYQ8~16P8Y1B
VRVIII System air conditioner
4PW39996-1A
Installation manual
19
9.
Complete
The display on the remote controller shows a flashing
PE
code
for signalling that automatic charging will be finished in about 10
minutes.
When the unit stops operating, close valve A immediately and
check the LEDs and check if the
P9
code is displayed on the
remote controller.
If the LED indication is not as shown above, correct the
malfunction (as indicated in the display of the remote controller)
and restart the complete charging procedure. When the
charging amount is little, the
PE
code may not be displayed, but
instead the
P9
code will be displayed immediately.
10. In case leak detection function required
Press the
button once for post-processing with
regard to the leak detection function and press the
button to confirm that charging is completed.
Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure
additional refrigerant charge weight into the PCB"
on
10. In case leak detection function not required
Press the
button once and the charging is complete.
Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure
additional refrigerant charge weight into the PCB"
on
2
Normal system display
3
Remote controller malfunction code display
Remote controller heating mode malfunction codes
Remote controller cooling mode malfunction codes
11.6. Procedure for inputting the additional
refrigerant charge weight into the PCB
Availability of the leak detection function feature requires input of the
additional refrigerant charge amount immediately after finishing the
automatic charging. The input must be executed before performing
the test operation.
Procedure
1
Close the electric box lid and all front panels except the one on
the side of the electric box.
2
Press and hold the
button for 5 seconds to enter into
setting mode 2.
The H1P LED is on
w
.
3
Press the
button 14 times.
The LED display must be as follows:
Press the
button once as confirmation of the
LEDs combination.
LEDs will be blinking in function of the last entered setting
(factory setting = 0 kg).
H1P
H2P
H3P
H4P
H5P
H6P
H7P
c c c w w w w
NOTE
Always close valve A and remove the refrigerant
tank immediately after finishing the refrigerant
charge operation.
The refrigerant charge port of these units have
electric expansion valves that will close
automatically when refrigerant charging operation
has finished. However, the electric expansion
valves will be opened when other operations start
after finishing refrigerant charging operation.
If the refrigerant tank is left with the valve open,
the amount of refrigerant which is properly
charged may be off the point.
H1P
H2P
H3P
H4P
H5P
H6P
H7P
w c c w w w w
Beware of the fan blades when you open the front panel.
The fan may still rotate for a while after unit operation has
stopped.
LED display
(Default status
before delivery)
Micro-
computer
operation
monitor
Mode
Ready
/Error
Cooling/Heating
changeover
Low
noise
Demand
Indivi-
dual
Bulk
(master)
Bulk
(slave)
HAP
H1P
H2P
H3P
H4P
H5P
H6P
H7P
Outdoor unit system
c
x
x
w
x
x
x
x
BS4 TEST
BS1 MODE
BS1 MODE
Error code
P8
recharge
operation
Close valve A immediately and press the TEST OPERATION
button once.
The operation will restart from the charging mode judgement
onwards.
P2
charge
hold
Close valve A immediately. Check
following items:
- Check if the gas stop valve is opened
correctly
- Check if the valve of the refrigerant
cylinder is opened
- Check if the air inlet and outlet of the
indoor unit are not obstructed
After correcting the
abnormality, restart
the automatic
charging procedure
again.
Error code
PE
Charging is almost finished. Ready to close valve A.
P9
Charging is finished. Close valve A and remove the refrigerant
tank.
PA
,
PH
replace
cylinder
Close valve A and replace the empty cylinder.
After replacing the cylinder, open valve A again and continue the
work (the outdoor unit will not stop operating).
P8
recharge
operation
Close valve A immediately.
Restart the automatic charging procedure again.
P2
charge
hold
Close valve A immediately. Check
following items:
- Check if the high pressure/low
pressure gas pipe, suction gas pipe
and liquid pipe stop valves are opened
correctly
- Check if the valve of the refrigerant
cylinder is opened
- Check if the air inlet and outlet of the
indoor unit are not obstructed
After correcting the
abnormality, restart
the automatic
charging procedure
again.
*
abnormal
stop
Close valve A immediately. Confirm the
malfunction code by the remote controller
and correct the abnormality by following
the
"Correcting after abnormal completion
of the test operation" on page 24
If a wrong value is input for the additional charged
refrigerant weight, the accuracy of the leak detection
function will decrease.
H1P
H2P
H3P
H4P
H5P
H6P
H7P
w x
x w w w x
BS1 MODE
BS2 SET
BS3 RETURN