Installation and operation manual
3
FXLQ20~63P7VEB
VRV System air conditioners
4PW53089-1B
I
NDOOR
UNIT
INSTALLATION
As for the parts to be used for installation work, be sure to use the
provided accessories and specified parts designated by our
company.
Make sure wiring, piping and drain piping meets your customer's
requirements and must comply with local and national regulations.
How to open and close the front panel
To open the front panel, remove 4 screws from the corner pieces,
unhook the corner pieces and remove the front panel as shown in the
figure below.
To close the front panel, use the opposite method.
Floorstanding installation
1
Level the indoor unit with the
leveling screws (accessory part).
If the floor is too uneven to level
the unit, place the unit on a flat
and level base.
2
If the unit is in danger of falling over, either fasten to the wall
using the holes provided, or fasten to the floor with a field
supplied floor fastener.
Wallmounted installation
1
Positioning of holes for fastening to the wall.
Unit of measurement = mm.
2
The legs can be removed if the indoor unit is to be hung on a
wall. To do so, remove the legs and mount the 2 decorationstrips
to the corner pieces as shown in the figures below.
Ensure the unit is level when installed so that drainage
flows smoothly. If inclined, water can leak.
Make sure that the floor is strong enough to bear the unit
weight.
1
1
2
2
3
2
2
1
1
2
2
■
Check whether the wall is strong enough to bear the
weight of the unit. If there is a risk, reinforce the wall
before installing the unit.
■
Use the installation mount on the rear of the unit for
installation.
■
The unit requires minimum 100 mm
clearance on the underside for air
intake and minimum 20
mm
clearance from the wall by using
spacers (field supply).
Model
A (mm)
FXLQ25
590
FXLQ40
730
FXLQ63
1010
≥
100
>20
A
205
205
192
232
1
1
5
6
7
3
5
2
6
5
2
5
4
4
Содержание VRV
Страница 14: ...4PW53089 1B Copyright Daikin...