5
|
Preparation
Installer and user reference guide
30
RYYQ+RYMQ+RXYQ8~20U7Y1B
VRV IV+ heat pump
4P546228-1A – 2019.10
E
When there is a room division that has an opening sufficiently large
to permit free air flow.
a
b
a
Opening between the rooms. In case there is a door the openings
above and below the door each must be equivalent in size to 0.15%
or more of the floor area.
b
Room division
3
Calculate the refrigerant density using the results of the calculations in steps 1
and 2 above. If the result of the above calculation exceeds the maximum
concentration level, a ventilation opening to the adjacent room shall be made.
Formula
F/G≤H
F
Total volume of refrigerant in the refrigerant system
G
Size (m
3
) of smallest room in which there is an indoor
unit installed
H
Maximum concentration level (kg/m
3
)
4
Calculate the refrigerant density taking the volume of the room where the
indoor unit is installed and the adjacent room. Install ventilation openings in
the door of adjacent rooms until the refrigerant density is smaller than the
maximum concentration level.
5.3 Preparing refrigerant piping
5.3.1 Refrigerant piping requirements
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant.
▪
Only use phosphoric acid deoxidised seamless copper.
▪
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
▪
Temper grade: use piping with temper grade in function of the pipe diameter as
listed in table below.
Pipe Ø
Temper grade of piping material
≤15.9 mm
O (annealed)
≥19.1 mm
1/2H (half hard)
▪
All piping lengths and distances have been taken into consideration (see
"5.3.4 About the piping length"
35]).
Содержание VRV IV+
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ...4P546228 1A 2019 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...