Specifications
ED34-862
384
FXUQ-MA
BEV Units
Connection Example
Model
BEVQ71MAVE
BEVQ100MAVE
BEVQ125MAVE
Power Supply
1 Phase 50Hz 220~240V
1 Phase 50Hz 220~240V
1 Phase 50Hz 220~240V
Casing
Galvanized Steel Plate
Galvanized Steel Plate
Galvanized Steel Plate
Dimensions: (H×W×D)
mm
100×350×225
100×350×225
100×350×225
Sound Absorbing Thermal Insulation
Material
Flame and Heat Resistant Foamed
Polyethylene
Flame and Heat Resistant Foamed
Polyethylene
Flame and Heat Resistant Foamed
Polyethylene
Piping
Connection
Indoor
Unit
Liquid Pipes
9.5mm (Flare Connection)
9.5mm (Flare Connection)
9.5mm (Flare Connection)
Gas Pipes
15.9mm (Flare Connection)
15.9mm (Flare Connection)
15.9mm (Flare Connection)
Outdoor
Unit
Liquid Pipes
9.5mm (Flare Connection)
9.5mm (Flare Connection)
9.5mm (Flare Connection)
Suction Gas Pipes
15.9mm (Flare Connection)
15.9mm (Flare Connection)
15.9mm (Flare Connection)
Machine Weight (Mass)
kg
3.0
3.0
3.5
Standard Accessories
Installation manual, Gas piping
connections, Insulation for fitting,
Sealing material, Clamps
Installation manual, Gas piping
connections, Insulation for fitting,
Sealing material, Clamps
Installation manual, Gas piping
connections, Insulation for fitting,
Sealing material, Clamps
Drawing No.
4D045387A
4D045387A
4D045388A
BRC1C62
Power
Power
supply
supply
line
line
Transmission
Transmission
line
line
Control
Wiring
Control
Wiring
1. Wiring Work
•The connecting line between SkyAir Indoor Unit
– BEV Unit : 3 cores…like a Transmission Line
•BEV Unit’s power supply line;
Single phase 2 line…like a VRV Indoor unit
•BEV Unit – other
VRV
indoor unit or outdoor unit –
: 2 cores…DIII network wiring (super wiring)
2. Piping work
SkyAir side,Outdoor Unit Side,They are both flare
connection.
- When connecting centralized-control device, it is necessary to
install an interface
adaptor for SkyAir series in an indoor unit.
- Distance between indoor unit and –BEV unit must be
within 5m
.
Consideration matter
Installation pattern / maintenance
Outline figure
Gas pipe (With Thermistor,
Liquid pipe
Insulation pipe cover)
Electric valve drive part
Hanger
PC board
Terminal block
SW.BOX cover
Piping part cover
(Wall surface attachment is also possible)
1. Level installation (It hangs by two hangers)
2. Vertical Installation
(Wall Surface Mounted)
Service space*1
*1; Service space for switch box.
(Service access panel is required for the bottom side. When there is nothing, 350 or more spaces are required. )
*2; For electric valve drive part’s maintenance. (a control box is removed)
Installation
space
150 or more
Service
space*2
100 or more
Gas pipe
Screw fixed
(x2 Screws x2 place)
Hanger bolt
Liquid pipe
Service access panel (450 x 450 )
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание VRV III
Страница 49: ...Features ED34 862 44 General Information Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 51: ...ED34 862 46 Indoor Units Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 100: ...ED34 862 Accessories FXFQ P 95 2 1P136564E Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 101: ...Accessories ED34 862 96 FXFQ P 1P136564E Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 147: ...Accessories ED34 862 142 FXCQ M Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 291: ...Accessories ED34 862 286 FXMQ P 3P225173A Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 293: ...Accessories ED34 862 288 FXMQ P Installation 3P012475C Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 298: ...ED34 862 Accessories FXMQ P 293 7 2P226887 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 299: ...Accessories ED34 862 294 FXMQ P 2P226887 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 319: ...Accessories ED34 862 314 FXMQ MA Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 350: ...ED34 862 Installation FXAQ MA 345 10 Service Space Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 351: ...Installation ED34 862 346 FXAQ MA Installation Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 352: ...ED34 862 Installation FXAQ MA 347 10 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 353: ...Installation ED34 862 348 FXAQ MA Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 354: ...ED34 862 Installation FXAQ MA 349 10 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 355: ...Installation ED34 862 350 FXAQ MA Drain Piping Work Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 360: ...ED34 862 Accessories FXAQ MA 355 10 3K019617 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 361: ...Accessories ED34 862 356 FXAQ MA 3K019617 3K019618 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 362: ...ED34 862 Accessories FXAQ MA 357 10 3K019618 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 363: ...Accessories ED34 862 358 FXAQ MA 3K019618 Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 419: ...Accessories ED34 862 414 FXUQ MA Все каталоги и инструкции здесь http splitoff ru tehn doc html ...
Страница 421: ...ED34 862 416 Outdoor Air Processing Unit Все каталоги и инструкции здесь http splitoff ru tehn doc html ...