![Daikin VRV II REYQ10MY1B Скачать руководство пользователя страница 108](http://html.mh-extra.com/html/daikin/vrv-ii-reyq10my1b/vrv-ii-reyq10my1b_service-manual_502225108.webp)
Si39-306
Test Operation
Test Operation
97
1.1.3
Check Operation
* During check operation, mount front panel to avoid the misjudging.
* Check operation is mandatory for normal unit operation.
(When the check operation is not executed, alarm code "U3" will be displayed.)
Refer the detail of check operation function to page 131.
On completion of test operation, LED on outdoor unit PC board displays the following.
H3P ON: Normal completion
H2P and H3P ON: Abnormal completion
→
Check the indoor unit remote controller for
abnormal display and correct it.
In the case of multi-outdoor-unit system, make setting on the master unit PC board. (Setting
with the slave unit is disabled.)
[LED display in the case of multi-outdoor-unit system] (Same as that in emergency operation)
* Discriminate the operating status of the master unit/slave units through the following LED
display.
Malfunction code
In case of an alarm code displayed on remote controller:
Check on operation
(V3057)
Press and hold the TEST
OPERATION button (BS4) on
outdoor unit PC board for 5
seconds.
¡
The test operation is started automatically.
The following judgements are conducted within 15 minutes.
2
“Check for wrong wiring”
2
“Check refrigerant for over charge”
2
“Check stop valve for not open”
2
Pipe length automatic judgement”
The following indications are conducted while in test operation.
2
LED lamp on outdoor unit PC board H2P flickers (test operation)
2
Remote controller Indicates “On Centralized Control” on upper
right.
Indicates “Test Operation” on lower left
LED display (
7
:ON
7
7
:OFF
9
9
:Blink)
H1P---H7P H8P
(Factory set)
Master:
Slave 1:
Slave 2:
77
7777777
7777 7
7777777
7777777 9
9
7777777 7
7777777 7
Cause of trouble due to faulty
installation work
Alarm
code
Countermeasure
Closed stop valve of outdoor unit
E3
E4
F3
UF
In case of REYQ8 to 16M (Single outdoor installation)
Liquid side stop valve : Open
Gas side stop valve : Open
Oil equalizing pipe stop valve : Close
In case of REYQ18 to 48M (Multi outdoor installation)
Liquid side stop valve : Open
Gas side stop valve : Open
Oil equalizing pipe stop valve : Open
Reversed phase in power cable
connection for outdoor unit
U1
Change connection of two wires among three for correct phasing.
Electric power for outdoor or indoor unit
is not supplied. (Including open phase)
U4
Check that the power cable for outdoor unit is connected properly.
Incorrect wiring between units
UF
Check that the wiring between units corresponds correctly to
refrigerant piping system.
Refrigerant overcharge
E3
F6
UF
Compute again optimum amount of refrigerant to be added based on
the piping length, then, collect the excessive amount by using
refrigerant collector to make the refrigerant amount proper.
Insufficient refrigerant
E4
F3
- Check that additional charging has been carried out.
- Compute again the refrigerant amount to be added based on the
piping length, and charge proper amount of refrigerant additionally.
Содержание VRV II REYQ10MY1B
Страница 19: ...Model Selection Si39 306 8 General Information ...
Страница 150: ...Si39 306 Troubleshooting by Remote Controller Troubleshooting 139 ...
Страница 249: ...Piping Diagrams Si39 306 238 Appendix 1 Piping Diagrams 1 1 Outdoor Unit REYQ8MY1B REYQ10MY1B REYQ12MY1B 4D042069A ...
Страница 250: ...Si39 306 Piping Diagrams Appendix 239 REYQ14MY1B REYQ16MY1B 4D042070A ...
Страница 252: ...Si39 306 Piping Diagrams Appendix 241 1 3 BS Unit BSVQ100MV1 BSVQ160MV1 BSVQ250MV1 4D042115 ...
Страница 254: ...Si39 306 Wiring Diagrams for Reference Appendix 243 REYQ14MY1B REYQ16MY1B 3D038572 ...
Страница 255: ...Wiring Diagrams for Reference Si39 306 244 Appendix 2 2 Field Wiring REYQ8 10 12 14 16MY1B 3D043435 ...
Страница 256: ...Si39 306 Wiring Diagrams for Reference Appendix 245 REYQ18 20 22 24 26 28 30 32MY1B 3D043436 ...
Страница 257: ...Wiring Diagrams for Reference Si39 306 246 Appendix REYQ34 36 38 40 42 44 46 48MY1B 3D043437 ...
Страница 258: ...Si39 306 Wiring Diagrams for Reference Appendix 247 2 3 Indoor Unit FXCQ20M 25M 32M 63MVE 3D039556A ...
Страница 259: ...Wiring Diagrams for Reference Si39 306 248 Appendix FXCQ40M 50M 80M 125MVE 3D039557A ...
Страница 260: ...Si39 306 Wiring Diagrams for Reference Appendix 249 FXZQ20M 25M 32M 40M 50MVE 3D038359 ...
Страница 261: ...Wiring Diagrams for Reference Si39 306 250 Appendix FXFQ25M 32M 40M 50M 63M 80M 100M 125MVE 3D039600 ...
Страница 262: ...Si39 306 Wiring Diagrams for Reference Appendix 251 FXKQ25M 32M 40M 63MVE 3D039564A ...
Страница 263: ...Wiring Diagrams for Reference Si39 306 252 Appendix FXSQ20M 25M 32M 40M 50M 63M 80M 100M 125MVE 3D039561A ...
Страница 264: ...Si39 306 Wiring Diagrams for Reference Appendix 253 FXMQ40M 50M 63M 80M 100M 125MVE 3D039620A ...
Страница 265: ...Wiring Diagrams for Reference Si39 306 254 Appendix FXMQ200M 250MVE 3D039621A ...
Страница 266: ...Si39 306 Wiring Diagrams for Reference Appendix 255 FXHQ32M 63M 100MVE 3D039801C ...
Страница 267: ...Wiring Diagrams for Reference Si39 306 256 Appendix FXAQ20M 25M 32MVE 40M 50M 63MVE 3D034206A ...
Страница 269: ...Wiring Diagrams for Reference Si39 306 258 Appendix 2 4 BS Unit BSVQ100MV1 BSVQ160MV1 BSVQ250MV1 3D039903 ...
Страница 283: ...REFNET Pipe System Si39 306 272 Appendix ...
Страница 284: ...Si39 306 Appendix 273 DPSOH RI RQQHFWLRQ 5 7 SH 5 4 0 HDW 5HFRYHU ...
Страница 285: ...Si39 306 274 Appendix ...
Страница 291: ...Method of Replacing The Inverter s Power Transistors and Diode Modules Si39 306 280 Appendix ...
Страница 305: ...Si39 306 iv Index ...