
4
|
Maintenance
Service manual
57
VAM350~200 EKVDX32~100A2VEB
VRV system air conditioner
ESIE22-07 – 2022.02
4 Maintenance
NOTICE
General maintenance/inspection checklist.
Next to the maintenance instructions in
this chapter, a general maintenance/inspection checklist is also available on the
Daikin Business Portal (authentication required).
The general maintenance/inspection checklist is complementary to the instructions
in this chapter and can be used as a guideline and reporting template during
maintenance.
4.1 Maintenance for heat reclaim ventilation units
CAUTION
See "User safety instructions" in the installer reference guide to aknowledge all
related safety instructions.
NOTICE
Maintenance MUST be done by an authorised installer or service agent.
We recommend performing maintenance at least once a year. However, applicable
legislation might require shorter maintenance intervals.
NOTICE
We recommend to clean at least once every 2 years (for general office use). If
necessary, shorter maintenance intervals might be required.
NOTICE
Applicable legislation on
fluorinated greenhouse gases
requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes:
GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
4.1.1 Maintenance safety precautions
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
NOTICE: Risk of electrostatic discharge
Before performing any maintenance or service work, touch a metal part of the unit in
order to eliminate static electricity and to protect the PCB.
draft – 07/02/2022 15:12
Содержание VAM350J8VEB
Страница 102: ......
Страница 103: ......
Страница 104: ...draft 07 02 2022 15 12 ESIE22 07 2022 02 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...