IOM 1206-13 • TRAILBLAZER
®
MODEL AGZ CHILLERS
8
www.DaikinApplied.com
Installation and Application Information
Operational Spacing Requirements
Sufficient clearance must be maintained between the unit
and adjacent walls or other units to allow the required unit air
flow to reach the coils. Failure to do so will result in a capacity
reduction and an increase in power consumption. No solid
obstructions are allowed above the unit at any height, see
The clearance requirements shown are a general guideline
and cannot account for all scenarios. Such factors as prevailing
winds, additional equipment within the space, design outdoor
air temperature, and numerous other factors may require more
clearance than what is shown. Additional clearances may be
required under certain circumstances.
Graphs on the following pages give the minimum clearance for
different types of installations and also capacity reduction and
power increase if closer spacing is used. The graphs are based
on individual cases and should not be combined with other
scenarios.
CAUTION
Unit performance may be impacted if the operational
clearance is not sufficient.
Case 1: Building or Wall on One Side of Unit
NOTE:
Assumes a solid height wall taller than unit. Refer to
Case 4 for partial wall openings.
For models AGZ030-101E, maintain a 4 feet minimum from a
wall of any height.
For models AGZ110-130E, maintain a 6 feet minimum from a
wall of any height.
For models AGZ140-241E, maintain a 8 feet minimum from a
wall of any height.
Figure 4: Building or Wall on One Side of Unit
Case 2: Two Units, Side-by-Side
For models 030-180, there must be a minimum of 4 feet
between two units placed side-by-side; however, performance
may be affected at this distance. For models 191-241,
the minimum is 6 feet as closing spacing may cause air
recirculation and elevated condenser pressure. Assuming
the requirement of one side having at least 8 feet of
service clearance is met, Case 2 figures show performance
adjustments as the distance between two units increases.
Figure 5: Two Units, Side-by-Side
Figure 6: Case 2 - Full Load Capacity Reduction
Figure 7: Case 2 - Power Increase
Height
of
Wall
Distance
Between
Wall
and
Unit
D
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4
5
6
8
%
C
ap
ac
ity
R
ed
uc
tio
n
Distance Between Units (ft)
Full Load Capacity Reduction
AGZ030-070E
AGZ075-101E
AGZ110-130E
AGZ140-180E
AGZ191-211E
AGZ226-241E
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
4
5
6
8
%
P
ow
er
In
cr
ease
Distance Between Units (ft)
Power Increase
AGZ030-070E
AGZ075-101E
AGZ110-130E
AGZ140-180E
AGZ191-211E
AGZ226-241E