SiBE041012_A
217
Trial Operation and Field Settings
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................218
2. Forced Cooling Operation ...................................................................219
3. Trial Operation ....................................................................................221
4. Field Settings ......................................................................................222
4.1
When 2 Units are Installed in 1 Room..................................................222
4.2
Standby Electricity Saving....................................................................223
4.3
Jumper and Switch Settings.................................................................223
5. Application of Silicon Grease to a Power Transistor
and a Diode Bridge .............................................................................224