Indoor Heat Exchanger

Si051261EB

14

Removal Procedure

9. Indoor Heat Exchanger

Warning

Š

Be sure to wait for 10 minutes or more after turning off all power supplies before 
disassembling work.

Š

In pump-down work, be sure to stop the compressor before disconnecting the 
refrigerant pipe. If the refrigerant pipe is disconnected with the compressor operating 
and the stop valve open, air may be sucked in and may generate an over-pressure in 
refrigeration cycle, thus resulting in pipe rupture or accidental injury.

Š

When removing or reinstalling the indoor heat exchanger, be sure to wear gloves or 
wrap the indoor heat exchanger with cloths. (You may be injured by the fins.)

Caution

Š

Be sure to conduct pump down operation before disassembling the refrigerant pipe.

Š

If the refrigerant leaks, repair the spot of leaking, then collect all refrigerant from the 
unit. After conducting vacuum drying, recharge proper amount of refrigerant.

Š

From the viewpoint of global environmental protection, make sure to use a vacuum 
pump for air purging.

Š

To prevent the indoor heat exchanger from falling down, the work should be done by 2 
persons.

Step

Procedure

Points

1

Disconnect the auxiliary 
flexible tube.

2

Remove the 2 screws 
of the piping fixture.

3

Remove the 2 screws 
at the left side of the 
indoor heat exchanger.

Auxiliary flexible tube

(R3021)

(R18218)

Piping fixture

Indoor 

heat 

exchanger

Содержание Super Multi NX FLXS25BAVMB

Страница 1: ...REMOVAL PROCEDURE S E R V I C E M A N U A L Indoor Unit Inverter Floor Ceiling Suspended Dual Type 2 5 3 5 5 0 6 0 kW Class Si051261EB...

Страница 2: ...Service Manual Removal Procedure Indoor Unit zHeat Pump FLXS25BAVMB FLXS35BAVMB FLXS35BAVMB9 FLXS50BAVMB FLXS25BVMA FLXS35GVMA FLXS50GVMA FLXS60GVMA...

Страница 3: ...Grille 2 2 Front Panel 4 3 Horizontal Blade 6 4 Signal Receiver Unit Swing Motor 7 5 Discharge Grille 8 6 Drain Pan 9 7 PCBs Electrical Box 10 8 Fan Rotor Fan Motor 12 9 Indoor Heat Exchanger 14 Note...

Страница 4: ...e disassembling work Step Procedure Points 1 Remove the air filters 1 Pull the protrusions on the both sides of the front grille and open it 2 Hold the tab at the center of the air filter frame and pu...

Страница 5: ...at screwdriver 2 To remove the front grille unfasten the 3 hooks 3 Remove the side cover If it is difficult to remove the side cover from outside with fingers remove the front panel first then push th...

Страница 6: ...that the front panel may fall when the hooks are disengaged To prevent the front panel from falling down this work should be done by 2 persons Step Procedure Points 1 Remove the 4 screws of the front...

Страница 7: ...Removal Procedure 5 4 Unfasten the 3 hooks of the front panel 5 Press A section slightly at the center of the front panel and unfasten the hook 6 Remove the front panel Step Procedure Points Hook R29...

Страница 8: ...wer supplies before disassembling work Step Procedure Points 1 Open the horizontal blade 2 Deflect the 3 center bearings to the left side slightly and release the shafts of the horizontal blade 3 Bend...

Страница 9: ...ocedure Points 1 Remove the signal receiver unit 1 Unfasten the 2 hooks right and left sides to remove the signal receiver unit 2 Remove the wire harness of the signal receiver unit from the groove Re...

Страница 10: ...o wait for 10 minutes or more after turning off all power supplies before disassembling work Step Procedure Points 1 Remove the 2 screws on both sides 2 Unfasten the 2 hooks right and left sides and r...

Страница 11: ...e disassembling work Caution Be careful not to wet the floor with drain water Step Procedure Points 1 Disconnect the drain hose 2 Remove the 3 screws securing the suction side of the drain pan 3 Unfas...

Страница 12: ...ey were when reassembling Negligence of above procedure may result in catching wire with the front panel and may cause malfunction 1 Disconnect the earth ground wire and pull out the indoor heat excha...

Страница 13: ...trical box Slide the electrical box to the right side first to unfasten the hooks 1 Remove the 2 screws 2 Remove the electrical box by sliding it to unfasten the 2 hooks located at the opposite side o...

Страница 14: ...ng work Step Procedure Points 1 Remove the 3 fan rotor covers Securing hooks are located at A and B section Opposite side 2 Remove the 2 screws to remove the fan motor fixtures 3 Remove the screw to r...

Страница 15: ...i051261EB Fan Rotor Fan Motor Removal Procedure 13 4 Release the shaft supporting section using a hexagonal wrench for M6 to remove the fan motor Step Procedure Points R17694 Fan motor Fan rotor R3020...

Страница 16: ...oves or wrap the indoor heat exchanger with cloths You may be injured by the fins Caution Be sure to conduct pump down operation before disassembling the refrigerant pipe If the refrigerant leaks repa...

Страница 17: ...edure 15 4 Unfasten the hook located on the right side behind the indoor heat exchanger 5 Slide the indoor heat exchanger to the right to release the hook 6 Remove the indoor heat exchanger Step Proce...

Страница 18: ...Revision History Month Year Version Revised contents 09 2012 Si051261 First edition 11 2012 Si051261_A Model addition FLXS25 35 50BAVMB 12 2013 Si051261EB Model addition FLXS35BAVMB9...

Страница 19: ...pplied or specified by Daikin Ask a qualified installer or contractor to install those parts and accessories Use of unauthorised parts and accessories or improper installation of parts and accessories...

Отзывы: