2
|
Components
Service manual
78
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01C – 2020.07
To check the fuse of the main PCB
Prerequisite:
First perform all earlier main PCB checks, see
75].
1
Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
a
Fuse
Blown fuse on the main PCB?
Action
Yes
Replace the blown fuse, see
No
75] of the main PCB and
continue with the next procedure.
Problem solved?
After all checking procedures listed above have been performed:
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
2.8.2 Repair procedures
To correct the wiring from the main power supply terminal to the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
92].
2
Make sure that all wires are firmly and correctly connected, see
137].
3
Check the continuity of all wires.
4
Replace any damaged or broken wires.
Is the problem solved?
Action
Yes
No further actions required.
Содержание Split Comfora R32
Страница 163: ......
Страница 164: ...ESIE18 01C 2020 07 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...