background image

IM 770-1 • SKYLINE ROOF CURB

8

www.DaikinApplied.com

i

nsTallaTion

Install Unit On Roof Curb 

Check to see that all lifting brackets are secure and that the 

rigging cables and straps are clear of door handles or any 

other appendages of the unit. 
The units have two inch interlocking splice collars at each 

mating face. Care must be used so that the flanges engage as 

the unit sections are mounted together. The units must be set 

tightly together during lifting as the curb gasket will grip the unit 

base and make moving the unit difficult. 
Units with vestibules must be handled so that the lifting 

bracket can be removed after the unit is placed on the curbing. 

Remove the lifting bracket that projects inward over the 

curbing. Save the self tapping bolts. When the adjacent section 

is placed in position, use self tapping bolts to secure the bases 

together as illustrated in 

Figure 10

Complete cabinet by placing sealant over any areas that 

appear to have remaining gaps. Install the cabinet top strips as 

indicated in 

IM 672

 that is included with the air handler. 

Assemble and install all air hoods in accordance with the 

instructions that are provided with hood. 

Figure 10: Remove Vestibule Lifting Bracket    

Installation of Piping and Wiring 

 CAUTION

The base section of each cabinet has a drip pan installed 

below every panel that drains to the outside frame trough. Any 

holes cut through the bottom of the unit must also penetrate 

the drip pan. If holes are cut in the drip pan, they must be 

sealed to prevent moisture leakage.

Be sure that all piping, wiring and control penetrations that are 

made through the unit panels and floors are thoroughly sealed 

on both the inside and outside of the cabinet. 
A single metal thickness pan is provided in the bottom of the 

vestibule. The pan can be removed if necessary. If holes are 

cut into the pan for piping passage, the holes must be sealed 

to prevent moisture leakage.

Removable Lifting Bracket

Содержание Skyline

Страница 1: ...Installation and Maintenance Manual IM 770 1 Group Applied Air Systems Part Number IM 770 Date March 2014 Skyline Outdoor Air Handler Roof Curb...

Страница 2: ...Contents Table of Contents General Description 3 Curb Ready Air Handler 3 Unit location 3 Curbing Kit 3 Installation 6 Curbing Kit Assembly 6 Roof curbs with a Vestibule Assembly 6 Prepare Unit for In...

Страница 3: ...or service clearance Locating the unit away from occupied spaces and over utility areas corridors and auxiliary spaces will help reduce the transmission of sound and vibration to occupied spaces A con...

Страница 4: ...IM 770 1 SKYLINE ROOF CURB 4 www DaikinApplied com General Description Figure 2 Typical Submittal Drawing and Air Duct Allowances through the Roof Curb...

Страница 5: ...re two sections to be joined For field provided roof curbs it is recommended that intermediate supports be incorporated as appropriate for lateral rigidity of the roof curbs Intermediate supports are...

Страница 6: ...mbers The curb parts have labels attached that correspond with the locations of the parts Parts that are identical have the same part numbers End parts have number CU122 and center supports have numbe...

Страница 7: ...bead of sealant to the complete perimeter of the mating surface that has the splice collar projecting from the frame Use the frame as a guide as illustrated in Figure 7 Figure 7 Applying Sealant A ha...

Страница 8: ...in Figure 10 Complete cabinet by placing sealant over any areas that appear to have remaining gaps Install the cabinet top strips as indicated in IM 672 that is included with the air handler Assemble...

Страница 9: ......

Страница 10: ...to its standard terms and conditions of sale including Limited Product Warranty Consult your local Daikin Applied Representative for warranty details To find your local Daikin Applied Representative g...

Отзывы: